Causes of Uplift Deformation on the Right Bank of the Damof Tongjiezi Hydropower Station

ZHANG Chao-ping1,WANG Dong1,2,SHEN Ding-bin3,HUANG Hui-bao3, YU Zhen-zhen1   

  1. 1.School of Water Resource﹠Hydropower Engineering, Sichuan University, Chengdu 610065, China;
    2.State Key Laboratory of Hydraulics and Mountain River Engineering, Chengdu 610065, China;
    3. Reservoir and Dam Management Center, China Guodian Dadu River Hydropower Development Co., Ltd., Leshan 614900, China
  • Received:2013-12-11 Online:2015-05-01 Published:2015-05-14

Abstract: :Rarely seen abnormalities including settlement on the left and uplift deformation on the right with section 18# as dividing line were found at Tongjiezi Hydropower Station after reservoir impoundment. Through mining the monitored information and analyzing the structural geology and hydrogeology condition, we concluded that the abnormalities are regional chain reactions resulted from the unique structure and hydrogeology, which caused the change of deep confined water after reservoir impoundment. Since the impoundment, water level has remained normal, seepage in the dam site has stablized, and the uplift deformation gradually tends to be stable. At present it is not yet a threat to the safety of dam.

Key words: Tongjeizi, uplift of dam body, safety monitoring, correlation analysis, confined water