%0 Journal Article %A ZHANG Chao-ping %A WANG Dong %A SHEN Ding-bin %A HUANG Hui-bao %A YU Zhen-zhen %T Causes of Uplift Deformation on the Right Bank of the Damof Tongjiezi Hydropower Station %D 2015 %R 10.3969/j.issn.1001-5485.2015.05.011 %J Journal of Yangtze River Scientific Research Institute %P 57-60 %V 32 %N 5 %X :Rarely seen abnormalities including settlement on the left and uplift deformation on the right with section 18# as dividing line were found at Tongjiezi Hydropower Station after reservoir impoundment. Through mining the monitored information and analyzing the structural geology and hydrogeology condition, we concluded that the abnormalities are regional chain reactions resulted from the unique structure and hydrogeology, which caused the change of deep confined water after reservoir impoundment. Since the impoundment, water level has remained normal, seepage in the dam site has stablized, and the uplift deformation gradually tends to be stable. At present it is not yet a threat to the safety of dam. %U http://ckyyb.crsri.cn/EN/10.3969/j.issn.1001-5485.2015.05.011