In Situ Geostress Measurement and Analysis for the Power Tunnel of Bakun Hydroelectric Station

WANG An quan 1,AI Kai 2,YIN Jian min 2   

  1. 1.Sinohydro Corporation Limited, Beijing100048, China;
    2.Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,Yangtze River Scientific Research Institute, Wuhan430010, China
  • Received:2012-05-03 Revised:2013-06-04 Online:2013-06-04 Published:2013-06-04

Abstract:

To assess the reliability of the lining design for Bakun Hydroelectric Station’s power tunnel in Malaysia, the in situ geostress at three positions along the tunnels were measured by hydro fracturing method.