%0 Journal Article %A WANG An quan %A AI Kai %A YIN Jian min %T In Situ Geostress Measurement and Analysis for the Power Tunnel of Bakun Hydroelectric Station %D 2013 %R 10.3969/j.issn.1001-5485.2013.06.016 %J Journal of Yangtze River Scientific Research Institute %P 72-75 %V 30 %N 6 %X

To assess the reliability of the lining design for Bakun Hydroelectric Station’s power tunnel in Malaysia, the in situ geostress at three positions along the tunnels were measured by hydro fracturing method.

%U http://ckyyb.crsri.cn/EN/10.3969/j.issn.1001-5485.2013.06.016