JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2019, Vol. 36 ›› Issue (10): 122-126.DOI: 10.11988/ckyyb.20190864

• SAFE OPERATION ,MONITORING AND EARLY WARNING OF DYKE ENGINEERING • Previous Articles     Next Articles

Flood Routing in River-Reservoir System:Research Advances and Existing Problems

LU Yun-feng   

  1. Spatial Information Technology Application Department, Yangtze River Scientific Research Institute,Wuhan 430010, China
  • Received:2019-07-23 Online:2019-10-01 Published:2019-10-21

Abstract: In the scheduling of river-type reservoir, the impact of inflow flood, artificial regulation, and river basin topography on the flood routing process should be considered. By summarizing the research findings of flood wave features and dynamic reservoir capacity, we made it clear that the scheduling of river-type reservoir should be accomplished by coupling hydrologic and hydrodynamic models, and meanwhile that attention should be paid to the disturbance of artificial scheduling on the stage-discharge relation at dam site. We summarized that the effect of water flow structure on riverbed roughness should be taken into consideration in the calculation of reservoir flood routing. Furthermore, we reviewed the research achievements up to now of the flow characteristics near dam and pointed out that the three-dimensional flow characteristics near dam are remarkable. Taking the cross-section near dam as the boundary condition may cause systematic errors in calculation. In order to improve the accuracy of flood routing model, in future we should conduct in-depth research on the influence of manual regulation on the conveyance capacity of the cross-section near dam and roughness calibration.

Key words: river-reservoir system, flood wave, dynamic storage, flood regulation method, roughness, flow characteristics near dam, flood routing

CLC Number: 

Baidu
map