院报 ›› 2015, Vol. 32 ›› Issue (4): 59-64.DOI: 10.3969/j.issn.1001-5485.2015.04.012

• 水力学 • 上一篇    下一篇

标准Ⅱ型马蹄形断面水面线的积分算法

张志昌,贾斌   

  1. 西安理工大学 水利水电学院,西安 710048
  • 收稿日期:2013-11-01 修回日期:2014-02-21 出版日期:2015-04-01 发布日期:2015-04-21
  • 作者简介:张志昌(1954-),男,陕西西安人,教授,从事水工水力学方面的研究,(电话)13991942265(电子信箱)zhangzhichang1954@163.com。

Integral Algorithm for Water Surface Profile of Horseshoe Cross Section of Standard TypeⅡ

ZHANG Zhi-chang, JIA Bin   

  1. Institute of Water Resources and Hydro-electric Engineering, Xi’an University of Technology, Xi’an 710048, China
  • Received:2013-11-01 Revised:2014-02-21 Online:2015-04-01 Published:2015-04-21

摘要: 标准Ⅱ型马蹄形断面由于几何形状复杂,水面线的计算较为困难,研究其工程设计中的简化计算方法是完全必要的。根据标准Ⅱ型马蹄形断面的几何关系分析了标准Ⅱ型马蹄形断面不同区域内相对断面面积、相对湿周、相对水力半径、相对水深和相对水面宽度的计算方法。根据明渠恒定非均匀流水面线的微分方程,给出了标准Ⅱ型马蹄形断面水面线的分段试算法公式。根据最小二乘法拟合原理,给出了j′,Fr′2与相对水深h/r1的近似关系,并以此关系给出了标准Ⅱ型马蹄形断面水面线的积分公式,积分公式为显函数关系式,计算方便。通过3个算例比较了试算法和积分法的结果,其中试算法的步高取为1 mm,积分法与试算法相比,最大误差为0.965%,计算精度满足工程设计要求。

关键词: 标准Ⅱ型马蹄形断面, 明渠, 水面线, 分段试算法, 积分法

Abstract: The complex geometrical shape of standard type-II horseshoe cross section makes it difficult to calculate the water surface profile in it. It is necessary to work out a simplified calculation method for engineering design. According to the geometrical shape, the calculation methods of relative cross section area, relative wetted perimeter, relative hydraulic radius, relative water depth and relative width of water surface in different areas of standard type-II horseshoe cross section are given. Furthermore, according to differential equation of water surface profile in open-channel with constant non-uniform flow, the trial-and-error method of flow profile is given. On the basis of least square method, the approximation relationship between j′, Fr2 and relative depth h/r1 are given, and according to the relationship, the integral formula of water surface profile which is an explicit function with convenient calculation and high accuracy is obtained. The trial-and-error method and the integral method are applied to three examples and comparison between the results shows that the calculation accuracy of integral method meets the requirement of engineering design. The maximum error of integral method is 0.965% compared with the trial-and-error method with 1 mm step high.

Key words: standard type-II horseshoe cross section, open channel, water surface profile, trial-and-error method, integral method

中图分类号: 

Baidu
map