Characteristics and Countermeasures of Debris Flow in Zhugongdi Gully of Wudongde Hydropower Station

LIU Bo, NIU Yun-hua, WANG Ying-kui, DAI De-fu

Journal of Changjiang River Scientific Research Institute ›› 2017, Vol. 34 ›› Issue (2) : 126-131.

PDF(2978 KB)
PDF(2978 KB)
Journal of Changjiang River Scientific Research Institute ›› 2017, Vol. 34 ›› Issue (2) : 126-131. DOI: 10.11988/ckyyb.20161041
ENGINEERING APPLICATION AND OTHERS

Characteristics and Countermeasures of Debris Flow in Zhugongdi Gully of Wudongde Hydropower Station

  • LIU Bo1, NIU Yun-hua1, WANG Ying-kui1, DAI De-fu2
Author information +
History +

Abstract

The dam site of Wudongde Hydropower Station is threatened by a number of debris flow gullies. In this article, some prevention and control measures are presented to avoid huge losses caused by debris flow disasters. The static and dynamic characteristics of debris flows in Zhugongdi Gully were analyzed by means of field investigation and laboratory model test. In view of the particularity of terrain, geological conditions and project layout, the countermeasures of debris flow were proposed. In addition, the effect of the countermeasures in Zhugongdi Gully was tracked and evaluated. Results show that block dam could effectively prevent large particles of solid matter from being involved in debris flow activity and reduce the erosion degree of upstream gully. Silting field could detain some small particles of solid matter, and as a consequence only a small amount of solid substances and the flood are discharged through the drainage canal. Triangular drainage canal has the characteristics of three dimensional beam current, so the draining effect is significant. The outlet of drainage canal is located in hard bedrock with strong anti-scouring ability, conducive to the stability of drainage canal. The control system composed of block dam, silting field and drainage canal has good control effect. This research can be used as a reference for debris flow treatment in the future.

Key words

Wudongde hydropower station / Zhugongdi Gully / debris-flow / static and dynamic characteristics / countermeasure / treatment effect

Cite this article

Download Citations
LIU Bo, NIU Yun-hua, WANG Ying-kui, DAI De-fu. Characteristics and Countermeasures of Debris Flow in Zhugongdi Gully of Wudongde Hydropower Station[J]. Journal of Changjiang River Scientific Research Institute. 2017, 34(2): 126-131 https://doi.org/10.11988/ckyyb.20161041

References

[1] 游 勇,柳金峰,欧国强. 泥石流常用排导槽水力条件的比较. 岩石力学与工程学报, 2006, 25(增1): 2820-2825.
陈中学,汪 稔,胡明鉴,等. 黏土颗粒含量对蒋家沟泥石流启动影响分析. 岩土力学, 2010, 31(7): 2197-2201.
徐林荣,韩 征,苏志满,等. 泥石流流速横向分布特征与防治工程结构优化. 岩土力学, 2012, 33(12): 3715-3720.
周 健,高 冰,张 姣,等. 初始含水量对砂土泥石流启动影响作用分析. 岩石力学与工程学报, 2012, 31(5): 1042-1048.
舒安平,张 欣,唐 川,等. 不同坡度条件下非均质泥石流堆积过程与特征. 水利学报, 2013, 44(11): 1333-1337.
常 鸣,唐 川. 基于水动力的典型矿山泥石流运动模式研究. 水利学报, 2014, 45(11): 1318-1326.
柳金峰,游 勇,陈晓清,等. G213线都汶路豆芽坪坡面泥石流及其防治方案. 山地学报, 2015, 33(5): 611-618.
屈永平,唐 川,刘 洋,等. 四川省都江堰市龙池地区“8·13”泥石流堆积扇调查和分析. 水利学报, 2015, 46(2): 197-207.
贺 拿,陈宁生,曾 梅,等. 白鹤滩水电站坝址近场区泥石流临界雨量研究. 水利学报, 2015, 46(2): 239-247.
DZ/T 0239—2004,泥石流灾害防治工程设计规范.北京:中国标准出版社,2004.
DZ/T 0220—2006,泥石流灾害防治工程勘查规范.北京:中国标准出版社,2006.
PDF(2978 KB)

Accesses

Citation

Detail

Sections
Recommended

/

Baidu
map