When target water level falls sharply in river model experiment, tail gate may open excessively and flow velocity increases in a short time, destroying the riverbed terrain. In view of this, a steady control method for tail gate is put forward: stopping the tail gate PID (proportion-integration-differentiation) control mode in the early stage of experiment until the modeling water level approximates the target water level. In the scenario, if the target water level drops more than forecast, the target would decline in a regular interval until the actual water level is close to the final target .The magnitude and duration of the target decline are different according to different external experiment. This scheme is applied to the water supply system of Yangtze River Flood Control Model, and is embedded into the PID control system of tail gate. Experiments verified that the excessive adjustment of tail gate when target water level drops sharply is effectively controlled, hence ensuring the steady water level and improving the reliability of experiment system. As the duration of water level control is increased, we should select proper control parameters according to the model features.
Key words
water level control at tail gate /
PID /
flow velocity /
terrain /
river model experiment
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 吕列民. 水力模型尾水控制测控系统数学模型. 南昌大学学报(工科版),2005,27(2):48-51.
虞邦义,马 浩,俞国青. 差动式尾水调节系统数学模型. 泥沙研究,2005,(1):21-25.
任 伟,罗建华,何世钧,等. 基于变结构PID算法的河工模型尾门水位调节系统. 河南科学,2007,25(6):963-965.
刘建东,张鸾英,谷俊杰. 数字PID控制系统的鲁棒性分析与设计 . 华北电力大学学报,2003,30(6):30-33.
渠 庚,唐 峰,孙贵州,等. 时间变态对模型水流运动相似影响试验研究. 西安理工大学学报,2009,25(4):487-492.