Causes of Accumulated Air and Tailwater Malfunctions in Rubber Dam and Design of a Pumping and Drainage System

WANG Xing-chao

Journal of Changjiang River Scientific Research Institute ›› 2024, Vol. 41 ›› Issue (4) : 181-186.

PDF(4099 KB)
PDF(4099 KB)
Journal of Changjiang River Scientific Research Institute ›› 2024, Vol. 41 ›› Issue (4) : 181-186. DOI: 10.11988/ckyyb.20230124
Engineering Safety And Disaster Prevention

Causes of Accumulated Air and Tailwater Malfunctions in Rubber Dam and Design of a Pumping and Drainage System

  • WANG Xing-chao
Author information +
History +

Abstract

In water-filled rubber dams, air often accumulates at the top of the dam bag following water filling, which is challenging to completely remove. Similarly, when the rubber dam collapses and discharges water, residual tailwater frequently remains at the bottom of the dam bag, resisting complete discharge. To tackle these common problems, a system for efficiently pumping and discharging accumulated air and tailwater in rubber dams has been developed. Based on an analysis of the underlying causes and potential consequences of these problems, this paper introduces conceptual design principles and methodologies for the pumping and discharging pipeline, power device, and control system. Through verification via typical application examples, it has been demonstrated that this system effectively mitigates faults caused by accumulated air and tailwater along with associated challenges, and also ensures the rubber dam impounds at maximum water level and discharges at maximum discharge section. This innovation offers valuable insights for the meticulous design of rubber dam projects and the enhancement of traditional design approaches.

Key words

rubber dam / accumulated air / tailwater / pumping and drainage system / fault analysis / operation management / structural design

Cite this article

Download Citations
WANG Xing-chao. Causes of Accumulated Air and Tailwater Malfunctions in Rubber Dam and Design of a Pumping and Drainage System[J]. Journal of Changjiang River Scientific Research Institute. 2024, 41(4): 181-186 https://doi.org/10.11988/ckyyb.20230124

References

[1] 高本虎. 橡胶坝工程技术指南[M]. 2版. 北京: 中国水利水电出版社, 2006. (GAO Ben-hu. Guidelines for Rubber Dam Engineering Technology[M]. 2nd ed. Beijing: China Water Power Press, 2006.(in Chinese))
[2] GB/T 50979—2014, 橡胶坝工程技术规范[S]. 北京: 中国计划出版社, 2014. (GB/T 50979—2014, Technical Code for Rubber Dam Engineering[S]. Beijing: China Planning Press, 2014. (in Chinese))
[3] 王溥文, 韩昌海, 童中山. 橡胶坝技术及应用[M]. 北京: 中国水利水电出版社, 2008. (WANG Pu-wen, HAN Chang-hai, TONG Zhong-shan. Rubber Dam Technology and its Application[M]. Beijing: China Water Power Press, 2008.(in Chinese))
[4] 李风增. 胶南市风河梯级橡胶坝综合管理与运用[J]. 中国水利, 2007(16): 65. (LI Feng-zeng. Comprehensive Management and Application of Fenghe Cascade Rubber Dam in Jiaonan City[J]. China Water Resources, 2007(16): 65.(in Chinese))
[5] 韩 飞. 橡胶坝充排水系统常见故障分析与维护措施探讨[J]. 中国水能及电气化, 2021(9): 12-14. (HAN Fei. Analysis on Common Faults of Rubber Dam Water Filling and Drainage System and Discussion of Maintenance Measures[J]. China Water Power & Electrification, 2021(9): 12-14.(in Chinese))
[6] 刘洪金. 简析密云区橡胶坝充排水系统常见故障分析与维护措施[J]. 农业开发与装备, 2022(9): 138-139. (LIU Hong-jin. Analysis of Common Faults in Filling and Drainage System of Rubber Dam in Miyun District and Maintenance Measures[J]. Agricultural Development & Equipments, 2022(9): 138-139.(in Chinese))
[7] 罗造时.橡胶坝充排水系统设计探讨[J].治淮,2016(6): 29-30.(LUO Zao-shi. Discussion on Design of Water Filling and Drainage System for Rubber Dam[J]. Zhihuai, 2016(6): 29-30.(in Chinese))
[8] 李秀娟. 充水橡胶坝工程中充排水系统设计[J]. 水利建设与管理, 2012, 32(4): 3-5. (LI Xiu-juan. Design of Water Filling and Drainage System in Water-filled Rubber Dam Project[J]. Water Resources Development & Management, 2012, 32(4): 3-5.(in Chinese))
[9] 沈源国. 大型多跨橡胶坝充排水系统的设计[J]. 水利水电技术, 2010, 41(11): 27-28, 33. (SHEN Yuan-guo. Design of Water Filling and Draining System for Large and Muti-span Rubble Dam[J]. Water Resources and Hydropower Engineering, 2010, 41(11): 27-28, 33.(in Chinese))
[10] 陈晓群, 石自堂, 林 琳. 浅析橡胶坝坝袋振动因素及设计管理[J]. 中国农村水利水电, 2003(2): 42-44. (CHEN Xiao-qun, SHI Zi-tang, LIN Lin. Analysis on Vibration Factors and Design Management of Rubber Dam Bag[J]. China Rural Water and Hydropower, 2003(2): 42-44.(in Chinese))
[11] SL 554—2011, 橡胶坝坝袋[S]. 北京: 中国水利水电出版社, 2012. (SL 554—2011, Rubber Dam Bag[S]. Beijing: China Water Power Press, 2012. (in Chinese))
[12] GB/T 50979—2014, 橡胶坝工程技术规范[S]. 北京: 中国计划出版社, 2014. (GB/T 50979—2014, Technical cocle for Rubber Dam Engineering[S]. Beijing: China Planning Press, 2014. (in Chinese))
[13] 王兴超. 基于生态水利的海绵城市设计原则[J]. 水土保持通报, 2017, 37(5): 250-254, 289. (WANG Xing-chao. Design Principle of Sponge City Based on Ecological Water Conservancy[J]. Bulletin of Soil and Water Conservation, 2017, 37(5): 250-254, 289.(in Chinese))
[14] 李 岩, 蔡 新, 崔朕铭, 等. 基于Mooney-Rivlin模型的充水式橡胶坝工作性态研究[J]. 水电能源科学, 2015, 33(4): 100-102, 138. (LI Yan, CAI Xin, CUI Zhen-ming, et al. Study on Working State of Water Filling Rubber Dam Based on Mooney-Rivlin Model[J]. Water Resources and Power, 2015, 33(4): 100-102, 138.(in Chinese))
[15] SL 214—2015, 水闸安全评价导则[S]. 北京: 中国水利水电出版社, 2015. (SL 214—2015, Guidelines for Sluice Safety Evaluation[S]. Beijing: China Water Power Press, 2015. (in Chinese))
[16] SL 75—2014, 水闸技术管理规程[S]. 北京: 中国水利水电出版社, 2014. (SL 75—2014, Code for Technical Management of Sluices[S]. Beijing: China Water Power Press, 2014. (in Chinese))
[17] ZHANG X Q, TAM P W M, ZHENG W. Construction, Operation, and Maintenance of Rubber Dams[J]. Canadian Journal of Civil Engineering, 2002, 29(3): 409-420.
[18] 陈玉辉. 橡胶坝不同运行高度对洪水风险的影响分析[J]. 西北水电, 2023(2): 6-11. (CHEN Yu-hui. Impact Analysis of Rubber Dam on Flood Risk[J]. Northwest Hydropower, 2023(2): 6-11.(in Chinese))
[19] 张庆华, 刁艳芳, 程传民, 等. 梯级橡胶坝塌坝泄流计算仿真系统[J]. 水利水电科技进展, 2014, 34(4): 53-56. (ZHANG Qing-hua, DIAO Yan-fang, CHENG Chuan-min, et al. Cascade Rubber Dams Fall Discharge Calculation Simulation System[J]. Advances in Science and Technology of Water Resources, 2014, 34(4): 53-56.(in Chinese))
[20] 张 靖, 沈欣菲, 周升龙, 等. 橡胶坝塌坝最大泄流量快速估算方法[J]. raybet体育在线 院报, 2020, 37(4): 62-66. (ZHANG Jing, SHEN Xin-fei, ZHOU Sheng-long, et al. Fast Estimation Method for Maximum Discharge of Rubber Dam Collapse[J]. Journal of Yangtze River Scientific Research Institute, 2020, 37(4): 62-66.(in Chinese))
[21] 陈 敏,李泽军.于桥水库果河橡胶坝塌坝运行时间分析[J].海河水利,2022(13):48-50. (CHEN Min,LI Ze-jun. Analysis of Operation Time for Collapse of Guohe Rubber Dam in Yuqiao Reservoir[J]. Haihe River Water Conservancy,2022(13):48-50.(in Chinese))
[22] 王兴超. 基于海绵城市理论的地下水库工程设计[J]. raybet体育在线 院报, 2018, 35(8): 34-39. (WANG Xing-chao. Engineering Design of Underground Reservoir Based on Sponge City Theory[J]. Journal of Yangtze River Scientific Research Institute, 2018, 35(8): 34-39.(in Chinese))
[23] 张世功, 孙廷玺, 段伟华, 等. 沂河梯级橡胶坝调度运用实况对洪水影响分析[J]. 治淮, 2010(5): 15-17.(ZHANG Shi-gong,SUN Ting-xi, DUAN Wei-hua. Analysis on the Influence of Operation of Yihe Cascade Rubber Dam on Flood[J]. Zhihuai, 2010(5): 15-17.(in Chinese))
[24] 陈界仁,赵悦君,任 磊,等.基于数学模型的沂河橡胶坝群塌坝方案[J].水利水电科技进展,2022,42(1):75-79.(CHEN Jie-ren,ZHAO Yue-jun,REN Lei,et al.Collapse Scheme of Rubber Dam Group in Yihe River Based on Numerical Model[J]. Advances in Science and Technology of Water Resources,2022,42(1):75-79.(in Chinese))
[25] 阎诗武.泄水结构振动振源分析(一)[J].人民珠江,1999(2):21-25. (YAN Shi-wu. Analysis of Vibration Sources of Release Work(I)[J]. Pearl River,1999(2):21-25. (in Chinese))
[26] 阎诗武.泄水结构振动振源分析(二)[J].人民珠江,1999(3):36-38. (YAN Shi-wu. Analysis of Vibration Sources of Release Work(II)[J]. Pearl River,1999(3):36-38. (in Chinese))
[27] CHERAGHI-SHIRAZI N, KABIRI-SAMANI A R, BOROOMAND B. Numerical Analysis of Rubber Dams Using Fluid-Structure Interactions[J]. Flow Measurement and Instrumentation, 2014, 40: 91-98.
[28] 林兰兰. 清河橡胶坝充排水管路设计及电气控制方式探析[J]. 地下水, 2022, 44(1): 274-275, 290. (LIN Lan-lan. Discussion on Design of Filling and Drainage Pipeline and Electrical Control Mode of Qinghe Rubber Dam[J]. Ground Water, 2022, 44(1): 274-275, 290.(in Chinese))
[29] ZHANG Q, DIAO Y. Cascade Rubber Dams Fall Discharge Calculation and Analysis[J]. Canadian Journal of Civil Engineering, 2011, 38(8): 957-962.
[30] 王兴超. 一种抽排橡胶坝积气和尾水系统: 中国,CN112813929B[P]. 2022-08-02. (WANG Xing-chao. A System of Pumping and Drainage for Accumulated Gas and Tailwater in Rubber Dam: China, CN112813929B[P]. 2022-08-02. (in Chinese))
[31] CONRAD D A, MULDOON D P. Design and Application of a PC/PLC Utility Rubber Dam Control System[J]. Instrument Society of America,1995(6):351-362.
[32] SL 265—2016, 水闸设计规范[S]. 北京: 中国水利水电出版社, 2017. (SL 265—2016, Code for Design of Sluice[S]. Beijing: China Water Power Press, 2017. (in Chinese))
PDF(4099 KB)

Accesses

Citation

Detail

Sections
Recommended

/

Baidu
map