A set of advanced measure-control system is necessary to better carry out research on the physical model of Poyang Lake. As the largest outdoor physical model of lake and river in China, the physical model of Poyang Lake has higher requirements on the reliability of measure-control system and outdoor lightning performance. The measure-control system is composed of water supplying system, flow control system, water level and flow velocity measurement system, tail gate control system, lightning protection and grounding system, topographic survey system and so on. This paper briefly introduces the working principle, design scheme and application of the measuring subsystem. Equipped with modern network technology and high performance automatic measuring instruments, the model is of improved measure-control functions, such as real-time data acquisition, control and data processing of various parameters in the model test. Test results show that the measure-control system could meet the requirements of model test.
Key words
physical model of Poyang Lake /
measure-control system /
water level /
flow rate /
automatic control /
lightning protection
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 吴新生,许 明,魏国远.长江防洪模型量测控制系统的设计及应用[J].人民长江,2009,40(19):72-75.
[2] 虞邦义,葛国兴,梁 斌,等.淮干正淮段大型防洪模型设计与试验验证[J].水利水电技术,2001,32(10):17-19.
[3] 王庆新,黄启明.水工模型试验自动化测控系统[J].水利水电技术,1998,29(8):43-45.
[4] 蔡守允,张晓红.水利工程模型试验量测技术的发展[J].水资源与水工程学报,2009,20(1):78-80.
[5] 陈 诚,贾宁一,蔡守允.模型试验测量技术的研究应用现状及发展趋势[J].水利水运工程学报,2011,(4):154-158.
[6] 蔡守允,杨大明,朱其俊,等.水利工程模型试验计算机测量与控制系统[J].计算机测量与控制,2007,15(10):1325-1326,1369.
[7] 蔡守允,雷学锋,魏延文.河工模型试验测量与控制系统[J].水利水运工程学报,1999,(4):402-408.
[8] 贺昌海,雷川华,周小平,等.模型试验流量与水位自动控制系统研制[J].raybet体育在线
院报,2007,24(3):72-74.
[9] 万浩平,杨 楠.鄱阳湖湖区物理模型水位动态跟踪测试系统设计与实现[J].工业控制计算机,2014,27(11):75-76.
[10]李俊敏.河工模型尾门水位控制系统的设计与研究[J].raybet体育在线
院报,2016,33(5):135-138.
[11]蔡 辉,马洪蛟,孙典红,等.水工模型中水位的自动控制优化算法[J].河海大学学报(自然科学版),2002,30(5):95-97.
[12]陈 勇,陈鹏翔.模糊自适应PID在水工模型中的应用[J].微计算机信息,2007,23(10):101-102.