Extra-deep concrete cut-off wall with depth over 60 m has been used for the reinforcement of dangerous earth-rock dams in China. The stress of cutoff wall is complex and changeable due to reservoir water level fluctuation, slope loading effect, the embedded condition of bedrock as well as the characteristic of wall materials. In this paper, the deformation and stress of concrete cut-off wall in dam body are analyzed by 3D simulation based on Shen Zhujiang’s Double Yield Surface Model in association with Biot’s consolidation theory. The hazard elimination and reinforcement project of Hualiangting reservoir dam is taken as a case study. Results reveal that the impact of the old dam reinforcement and the rising of water level exert small influence on the concrete cut-off wall. We recommend to enhancing compressive strength and reducing elastic modulus in order to meet the requirements for stress and durability; due to stress increment at the bottom of cut-off wall, we also recommend additional reinforcement for concrete cut-off wall of non-linear dam.
Key words
Hualiangting reservoir /
earth-rock dam /
extra-deep concrete cut-off wall /
Shen Zhujiang’s Double Yield Surface Model /
Biot’s consolidation theory /
numerical simulation
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 杨启贵,高大水.我国病险水库加固技术现状及展望[J].人民长江,2011,42(12):6-11.
[2] 长江勘测规划设计研究院.安徽省安庆市花凉亭水库除险加固工程初步设计报告[R].武汉:长江勘测规划设计研究院,2008.
[3] 谭界雄,高大水,周和清,等.水库大坝加固技术[M].北京:中国水利水电出版社,2010.
[4] 余金煌,卓 越.基于高密度电法的花凉亭水库防渗墙质量测试与分析[J].治淮,2016,(3):17-19.
[5] 南京水利科学研究院.花凉亭水库碾压式黏土心墙坝防渗墙施工方案优化及地震安全分析研究[R].南京:南京水利科学研究院,2009.
[6] 程展林.三峡二期围堰垂直防渗墙的应变形态[J].raybet体育在线
院报,2004,21(6):34-37.