Calculation and Sensitivity Analysis of Risk Probability of Earth-rockDam Overtopping Caused by Floods Based on Monte-Carlo Method

LV Wan-wan, GU Sheng-ping, HE Lei, LIU Xin-xin, ZHAO Yi-meng

Journal of Changjiang River Scientific Research Institute ›› 2015, Vol. 32 ›› Issue (5) : 48-52.

PDF(957 KB)
PDF(957 KB)
Journal of Changjiang River Scientific Research Institute ›› 2015, Vol. 32 ›› Issue (5) : 48-52. DOI: 10.3969/j.issn.1001-5485.2015.05.009

Calculation and Sensitivity Analysis of Risk Probability of Earth-rockDam Overtopping Caused by Floods Based on Monte-Carlo Method

  • LV Wan-wan, GU Sheng-ping, HE Lei, LIU Xin-xin, ZHAO Yi-meng
Author information +
History +

Abstract

The detailed process to calculate risk probability of earth-rock dam overtopping caused by floods based on Monte-Carlo Method was presented in this paper. Factors affecting the risk probability, inclusive of flood, wind wave, reservoir scheduling and reservoir features were deeply analyzed and sensitivity analysis for these factors was conducted. An earth-rock dam in south China was taken for example. Results reveal that the mean value of peak flow, the coefficient of variation, as well as the mean value of maximum wind speed have large impact on the risk probability; whereas the coefficient of skewness and the mean wind speed variance have little effect. Besides, the reservoir characteristics and the initial water level before flood also have considerable influence on the risk probability. By comparing the calculated results with engineering analysis results, we conclude that it’s reliable to calculate the risk probability of earth-rock dam overtopping by using Monte-Carlo method.

Key words

earth-rock dam / overtopping risk probability / uncertain factors / Monte-Carlo method / sensitivity analysis

Cite this article

Download Citations
LV Wan-wan, GU Sheng-ping, HE Lei, LIU Xin-xin, ZHAO Yi-meng. Calculation and Sensitivity Analysis of Risk Probability of Earth-rockDam Overtopping Caused by Floods Based on Monte-Carlo Method[J]. Journal of Changjiang River Scientific Research Institute. 2015, 32(5): 48-52 https://doi.org/10.3969/j.issn.1001-5485.2015.05.009

References

[1] 麻荣永.土石坝风险分析方法及应用.北京:科学出版社,2004: 73-89.(MA Rong-yong. Methods of Analysing Earth-rock Dam and Their Applications. Beijing: Science Press, 2004: 73-89. (in Chinese))
[2]解家毕,孙东亚. 全国水库溃坝统计及溃坝原因分析.水利水电技术,2009,(12) :124-128. (XIE Jia-bi, SUN Dong-ya. Statistics and Causes of Dam Collapse in China. Technologies of Water Conservancy, 2009, (12): 124-128. (in Chinese))
[3] 李清富,龙少江. 大坝洪水漫顶风险评估.水力发电,2006,(7) :20-22. (LI Qing-fu, LONG Shao-jiang. Risk Assessment of Dam. Hydropower, 2006,(7) :20-22. (in Chinese))
[4] 詹道江,徐向阳,陈元芳. 工程水文学.北京:中国水利水电出版社,2010: 100-200. (ZHAN Dao-jiang, XU Xiang-yang, CHEN Yuan-fang. Engineering Hydraulics. Beijing: China Water Power Press, 2010: 100-200. (in Chinese))
[5] 赵经华,王长新.用蒙特卡罗法进行泄洪风险分析. 东北水利水电,2005,(10): 1-3.(ZHAO Jing-hua, WANG Chang-xin. Analysis of Flood Discharging Risk with Monte-Carlo Method. Water Resource & Hydropower of Northeast China, 2005,(10): 1-3. (in Chinese))
[6] 李其军,陈肇和. 土石坝漫坝风险理论与应用.北京:中国水利水电出版社,2008:16-24. (LI Qi-jun, CHEN Zhao-he. Theory and Application of Earth-rockfill Dam. Beijing: China Water Power Press, 2008: 16-24. (in Chinese))
[7] SL274—2001,碾压式土石坝设计规范. 北京:中国水利水电出版社, 2001.(SL274—2001, Design Code for Rolled Earth-rock Fill Dam. Beijing: China Water Power Press, 2001. (in Chinese))
[8] 顾圣平,田富强,徐得潜. 水资源规划及利用.北京:中国水利水电出版社,2009: 111-141. (GU Sheng-ping, TIAN Fu-qiang, XU De-qian. Planning and Utilization of Water Resources. Beijing: China Water Power Press, 2009: 111-141. (in Chinese))
[9] 周 立. 敏感性分析法在企业利润规划中的运用.四川行政学院学报,2002,(5):78-80. (ZHOU Li. Application of Sensitivity Analysis to Enterprise Profit Planning. Journal of Sichuan Administration College, 2002,(5):78-80. (in Chinese))
[10]MO Chong-xun, LIU Fang-gui, YU Mei, et al. Risk Analysis for Earth Dam Overtopping. Water Science and Engineering, 2008, 1(2): 76-87.
[11]ERDIK T J, DURICIC P. The Probabilistic Assessment of Overtopping Reliability on Akyayik Dam. KSCE Journal of Civil Engineering, 2003, 17(7): 1810-1819.
[12]MARENGO H, ARREGUIN F I, ALDAMA A A, et al. Case study: Risk analysis by Overtopping of Diversion Works During Dam Construction: The La Yesca Hydroelectric Project, Mexico. Structural Safety, 2013, 42(3): 26-34.
[13]LAVE L B, BALVANYOS T. Risk Analysis and Management of Dam Safety. Risk Analysis, 1998, 18(4): 455-462.