Technical Advances in Second Stage Cofferdam of TGP and Its Significance for High Cofferdam Construction in China

  • BAO Cheng-gang
Author information +
History +

Abstract

The Second Stage Cofferdam is one of the most challenging structures in TGP (Three Gorges Project). Not only it is very important for TGP, but also very difficult. Some construction conditions did not appear before in cofferdam construction history. Researches were carried out during the whole process of construction of 18 years,and the construction was completed by using new theory, new technology and new materials. The cofferdam worked very well in its 4year operation. Even during its demolition, additional tests and data collection were specially arranged to explore some unclear points. Experiences of high cofferdam construction and research innovations were obtained and are applied to high cofferdam construction in west China. They will promote the water resource technology in China.

Key words

high cofferdam in deep water / flexible diaphragm wall / finite element analysis / centrifugal modelling / compound geomembrane / unsaturated and unstable seepage analysis

Cite this article

Download Citations
BAO Cheng-gang. Technical Advances in Second Stage Cofferdam of TGP and Its Significance for High Cofferdam Construction in China[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(9): 33-42 https://doi.org/10.3969/j.issn.1001-5485.2014.09.007

References

[1] 哈秋舲,包承纲,饶冠生,等.长江三峡工程关键技术研究[M].广州:广东科技出版社,2002.(HA Qiu-ling, BAO Cheng-gang, RAO Guan-sheng, et al. Study on the Key Technology of TGP[M]. Guangzhou: Guangdong Science and Technology Press, 2002. (in Chinese))
[2] 潘家铮.对二期围堰建设的评价[J]. 中国三峡建设(工程技术版),1999,6(5):1-3.(PAN Jia-zeng. Evaluation on the Construction of 2nd Cofferdam[J]. China Three Gorges Construction (Engineering Technology Press),1999,6(5):1-3. (in Chinese))
[3] 潘家铮.春梦秋雨录-浮生散记(第3版)[M].北京:中国水利水电出版社,2012.(PAN Jia-zeng. A Record of Spring Dreaming and Fall Raining (Third Edition)[M]. Beijing: China Water Power Press, 2012. (in Chinese))
[4] 包承纲.二期围堰建设中若干关键技术问题的解决[J]. 中国三峡建设(工程技术版),1999,6(5):32-36.(BAO Cheng-gang. Solution of Some Key Technology Issues for 2nd Stage Cofferdam Construction of TGP[J]. China Three Gorges Construction (Engineering Technology Press), 1999,6(5):32-36.(in Chinese))
[5] 沈珠江, 刘松涛.三峡二期高土石围堰应力应变分析研究[J]. 人民长江,1996,27(10):1-4.(SHEN Zhu-jiang, LIU Song-tao. Study on Stress-strain Analysis of the 2nd Stage Cofferdam for TGP[J]. Yangtze River,1996,27(10):1-4.(10): (in Chinese))
[6] 李思慎, 吴昌瑜, 任大春.三峡二期围堰渗流问题研究[J]. raybet体育在线 院报,1997,14(4):66-69.(LI Si-shen, WU Chang-yu, REN Da-chun. Study on Seepage Problems of 2nd Stage Cofferdam for TGP[J]. Journal of Yangtze River Scientific Research Institute, 1997, 14(4):66-69.(in Chinese))
[7] 程展林,饶锡保,李 玫.三峡二期围堰填料特性和围堰断面的离心模型试验[J]. 中国三峡建设,1999,(5):(CHENG Zhan-lin, RAO Xi-bao, LI Mei. Testing on Properties of Filling Materials and Centrifuge Test of Cofferdam Structure for 2nd Cofferdam of TGP[J]. China Three Gorges Construction (Engineering Technology Press), 1999, (5):. (in Chinese))
[8] 李青云, 张建红, 包承纲.风化花岗岩开挖弃料配制三峡二期围堰防渗墙材料[J]. 水利学报,2004,(11): 114-118.(LI Qing-yun, ZHANG Jian-hong, BAO Cheng-gang. Study on Material of Diaphragm Wall Compound with Weathered Granite for 2nd Cofferdam in TGP[J]. Journal of Hydraulic Engineering, 2004, (11):114-118.(in Chinese))
[9] 包承纲, 钱胜国.风化砂、淤积砂的动力特性[J]. raybet体育在线 院报,1997,14(4):74-78.(BAO Cheng-gang, QIAN Sheng-guo. Dynamic Property of Weathered Granite and Sediment Sand[J]. Journal of Yangtze River Scientific Research Institute, 1997, 14(4):74-78.(in Chinese))
[10]王永明. 华东勘测设计研究院博士后开题报告[R]. 杭州:华东勘测设计研究院,2011.(WANG Yong-mimg.Opening Report for Post Doctor Degree[R]. Hangzhou: Huadong Institute of Investigation, Design and Research, 2011. (in Chinese))
[11]李青云, 程展林.三峡工程二期围堰运行后的性状分析[J]. 岩土工程学报,2005,27(4):410-413.(LI Qing-yun, CHENG Zhan-lin. Behavior Analysis of 2nd Cofferdam after Operating in TGP[J]. Journal of Geotechnical Engineering, 2005, 27(4):410-413.(in Chinese))
PDF(2027 KB)