Stress Analysis for the Core-wall of Pubugou Dam During Impoundment

LIN Jiang,CHEN Jia-wei,ZHOU Zhi-hui

Journal of Changjiang River Scientific Research Institute ›› 2013, Vol. 30 ›› Issue (5) : 42-46.

PDF(1624 KB)
PDF(1624 KB)
Journal of Changjiang River Scientific Research Institute ›› 2013, Vol. 30 ›› Issue (5) : 42-46. DOI: 10.3969/j.issn.1001-5485.2013.05.010
Engineering Safety and Disaster Prevention

Stress Analysis for the Core-wall of Pubugou Dam During Impoundment

  • LIN Jiang,CHEN Jia-wei,ZHOU Zhi-hui
Author information +
History +

Abstract

On the basis of monitoring data of Pubugou Hydropower Station during its impoundment,we analyzed the pore water pressure,soil pressure and the relationship between them in the core-wall. Results show that during the storage and discharge of water in the Pubugou Hydropower Station,the pore water pressure increases along with the rise of water level,and vice versa. The correlation between the water level and the osmotic pressure reduces from the upstream to the downstream ,and the reservoir water infiltration is the decisive factor of seepage water pressure variation in the core-wall. The variation pattern of soil pressure coincides well with that of pore water pressure. The adjustment of soil pressure value is jointly induced by water seepage and consolidation,which is mainly influenced by the water level in the upstream. During the reservoir impoundment,the effective stress drops,the percentage of pore water pressure in the soil pressure reaches 100%,and as the reservoir water reaches high level,local hydraulic fracture is likely to occur. The changjing laio of seepage pressure and soid pressure in the gravel soil core wall during the impoundment is summarized,similar projects as reference.

Key words

pore water pressure / soil pressure / effective stress / hydraulic fracturing

Cite this article

Download Citations
LIN Jiang,CHEN Jia-wei,ZHOU Zhi-hui. Stress Analysis for the Core-wall of Pubugou Dam During Impoundment[J]. Journal of Changjiang River Scientific Research Institute. 2013, 30(5): 42-46 https://doi.org/10.3969/j.issn.1001-5485.2013.05.010

References

[1] 中国水电工程顾问集团成都勘测设计研究院.四川省大渡河瀑布沟水电站枢纽工程蓄水阶段验收设计报告[R].成都:中国水电工程顾问集团成都勘测设计研究院,2009.(Chengdu Hydropower Investigation Design Institute of Hydro China. Report of the Design of Acceptance During Impoundment of Pubugou Hydropower Project on Dadu River in Sichuan Province[R]. Chengdu:Chengdu Hydropower Investigation Design Institute of Hydro China,2009.(in Chinese))
[2] 中国水电工程顾问集团成都勘测设计研究院.四川省大渡河瀑布沟水电站初步设计报告安全监测篇[R].成都:中国水电工程集团成都勘测设计研究院,2001.(Chengdu Hydropower Investigation Design Institute of Hydro China. Safety Monitoring Report of the Preliminary Design of Pubugou Hydropower Project on Dadu River in Sichuan Province[R]. Chengdu:Chengdu Hydropower Investigation Design Institute of Hydro China,2001.(in Chinese))
[3] 陈向浩,邓建辉,陈科文,等.高堆石坝砾石土心墙施工期应力监测与分析[J].岩土力学,2011,32(4): 1083-1088.(CHEN Xiang-hao,DENG Jian-hui,CHEN Ke-wen,et al. Stress Monitoring and Analysis of Gravelly Soil Corewall in High Rockfill Dam During Construction[J]. Rock and Soil Mechanics,2011,32(4):1083-1088.(in Chinese))
[4] 郑 俊,邓建辉,杨晓娟,等. 瀑布沟堆石坝砾石土心墙施工期孔隙水压力特征与分析[J].岩石力学与工程学报,2011,30(4): 709-717.(ZHENG Jun,DENG Jian-hui,YANG Xiao-juan,et al. Charcteristics and Analysis of Pore Water Pressures in Gravelly Soil Corewall of Pubugou Rockfill Dam During Construction Period[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(4): 709-717.(in Chinese))
[5] 涂 虬. Excel 在回归分析中的应用[J]. 武钢职工大学学报,2001,13(2):24-32.(TU Qiu. Application of Excel in Regression Analysis[J]. Journal of University for Staff and Workers of WISCO,2001,13(2):24-32.(in Chinese))
[6] 张坤勇,殷宗泽,朱俊高.各向异性对土质心墙坝水力劈裂的影响[J].岩土力学,2005,26(2):243-246.(ZHANG Kun-yong,YIN Zong-ze,ZHU Jun-gao,et al. Influence of Anisotropy on Hydraulic Fracturing of Earth Core Dams[J]. Rock and Soil Mechanics,2005,26(2): 243-246.(in Chinese))
[7] 殷宗泽,朱俊高,袁俊平,等.心墙堆石坝的水力劈裂分析[J].水利学报,2006,37(11):1348-1353.(YIN Zong-ze,ZHU Jun-gao,YUAN Jun-ping ,et al. Hydraulic Fracture Analysis of Rock-Fill Dam with Core wall[J]. Journal of Hydraulic Engineering,2006,37(11):1348-1353.(in Chinese))
[8] 殷宗泽.高土石坝的应力与变形[J].岩土工程学报,2009,31(1):1-14.(YIN Zong-ze. Stress and Deformation of High Earth and Rock-Fill Dams[J]. Chinese Journal of Geotechnical Engineering,2009,31(1):1-14.(in Chinese))
[9] 曹雪山,殷宗泽.土石坝心墙水力劈裂的非饱和土固结方法研究[J].岩土工程学报,2009,31(12):1851-1857.(CAO Xue-shan,YIN Zong-ze. Consolidation Method of Unsaturated Soils for Hydraulic Fracturing of Core Walls of Rock-Fill Dams[J]. Chinese Journal of Geotechnical Engineering,2009,31(12): 1851-1857.(in Chinese))