Simulation of Flat-spread Concrete Placement in Roller Compacted Concrete Dam

DU Zhi-da, HAO Xue-ying

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (5) : 102-106,116.

PDF(1336 KB)
PDF(1336 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (5) : 102-106,116. DOI: 10.3969/j.issn.1001-5485.2014.05.021
CONSTRUCTION AND MANAGEMENT OF WATER CONSERVANCY PROJECTS

Simulation of Flat-spread Concrete Placement in Roller Compacted Concrete Dam

  • DU Zhi-da, HAO Xue-ying
Author information +
History +

Abstract

Most of the current simulation on concrete dam construction is based on the assumption that the construction period is mainly controlled by concrete mixing and transportation instead of by concrete placement surface construction. By establishing a model which simulates the flat placement surface construction, we analyzed the construction progress of roller compacted concrete dam with flat-spread technique in the presence of different placement surfaces. We demonstrated that the placement technique also has large influence on the construction progress. This model more truly reflects the concrete placement for roller compacted concrete dams.

Key words

roller compacted concrete dam / flat-spread placement / construction simulation

Cite this article

Download Citations
DU Zhi-da, HAO Xue-ying. Simulation of Flat-spread Concrete Placement in Roller Compacted Concrete Dam[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(5): 102-106,116 https://doi.org/10.3969/j.issn.1001-5485.2014.05.021

References

[1] 钟登华,练继亮,吴康新,等.高混凝土坝施工仿真与实时控制[M].北京:中国水利水电出版社,2008. (ZHONG Deng-hua, LIAN Ji-liang, WU Kang-xin, et al. Construction Simulation and Real-Time Control for High Concrete Dam[M]. Beijing: China Water Power press, 2008.(in Chinese))
[2] 郑家祥, 钟登华, 胡程顺.等, 沙牌拱坝碾压混凝土浇筑中的关键技术研究[J]. 水力发电学报, 2004, (2): 83-87.(ZHENG Jia-xiang , ZHONG Deng-hua, HU Cheng-shun, et al. Study on the Key Techniques of Shapai Roller Compacted Concrete Arch Dam Construction[J]. Journal of Hydroelectric Engineering, 2004, (2): 83-87.(in Chinese))
[3] 李名川. 向家坝水电站大坝浇筑施工方案仿真分析与优化设计[D].天津:天津大学,2005. (LI Ming-chuan. Simulation and Optimization on the Dam Construction Schemes of Xiangjiaba Hydropower Station[D]. Tianjin: Tianjin University,2005.(in Chinese))
[4] 王忠耀. 向家坝水电站二期工程混凝土重力坝施工仿真与实时控制分析研究[D].天津:天津大学,2010.(WANG Zhong-yao. Research on Construction Simulation and Real-time Control Analysis for the Phase II Concrete Gravity Dam of Xiajiaba Hydropower Project[D]. Tianjin: Tianjin University, 2010.(in Chinese))
[5] 林鸿镁. 龙滩水电站大坝碾压混凝土运输方案的研究[J]. 红水河, 1999, (2): 26-32. (LIN Hong-mei. Research for Transport Plan of RCC in Dam of Longtan Hydroelectric Project [J]. Hongshui River, 1999, (2): 26-32.(in Chinese))
[6] 张双双. 龙开口水电站碾压混凝土坝大坝浇筑计算机仿真研究[D].天津:天津大学,2008. (ZHANG Shuang-shuang. Study on Computer Simulation of Longkaikou Roller Compacted Concrete Dam[D]. Tianjin: Tianjin University,2008. (in Chinese))
[7] 吴康新. 金安桥碾压混凝土坝施工动态可视化仿真与优化研究[D].天津:天津大学,2005. (WU Kang-xin. Dynamic Visual Simulation and Optimization for the Construction of Jinanqiao Roller-compacted Dam[D]. Tianjin: Tianjin University,2008. (in Chinese))
[8] 王仁超, 石 英, 李名川, 小湾大坝混凝土浇筑施工仿真研究[J]. 四川大学学报(工程科学版), 2004, (4): 10-14. (WANG Ren-chao, SHI Ying, LI Ming-chuan. Study on the Simulation of Arch Dam Construction in Xiaowan Project [J]. Journal of Sichuan University(Engineering Science Edition), 2004, (4): 10-14.(in Chinese))
[9] 郭 勇, 郑家祥. 高碾压混凝土拱坝施工工艺及模拟仿真研究[J]. 水电站设计, 2003, (3): 1-7.(GUO Yong, ZHENG Jia-xiang. Study on the Construction and Simulation of High Roller Compacted Arch Dam [J]. Design of Hydroelectric Power Station, 2003, (3): 1-7.(in Chinese))
[10]于雪峰,张以晓. 碾压混凝土坝施工坝面作业系统分析与模拟[J]. 黑龙江水专学报, 1995, (4): 9-12. (YU Xue-feng, ZHANG Yi-xiao. System Analysis and Computer Simulation on the Concrete Placing System of the Roller Concrete Dam Construction [J]. Journal of Engineering of Heilongjiang, 1995, (4): 9-12. (in Chinese))[11]冯惠军,冯允成. 面向对象的仿真综述[J]. 系统仿真学报, 1995, (3): 58-64. (FENG Hui-jun, FENG Yun-cheng. A Survey on Object-Oriented Simulation [J]. Journal of System Simulation, 1995, (3): 58-64. (in Chinese))
[12]杜志达, 马 岚. 江垭大坝RCC施工工艺[J]. 水利水电技术, 1998, (2): 19-22. (DU Zhi-da, MA Lan. Construction Progress of RCC in Jiangya Dam[J]. Water Resources and Hydropower Engineering,1998,(2):19-22. (in Chinese))
[13]郑家祥, 高碾压混凝土拱坝真三维施工模拟[J]. 水电站设计, 2003, (2): 1-7. (ZHENG Jia-xiang. Three-dimensional Simulation of High Roller Compacted Concrete Arch Dam Construction[J]. Design of Hydroelectric Power Station, 2003, (2): 1-7. (in Chinese))
PDF(1336 KB)

Accesses

Citation

Detail

Sections
Recommended

/

Baidu
map