The Shizishan tunnel of the Central Yunnan Water Diversion Project runs through the fracture structure clamping belt between FⅢ-102 and F16 where the D11 calcareous shale and carbonaceous shale are loosely consolidated under high in-situ stress. Geological analysis shows that the residual high in-situ stress of geological compression structure is the major driving force of the large deformation of tunnel, and the low load-resistance and degraded broken structure is the main internal cause of the instability and deformation of tunnel. Site investigation reveals the damage of tunnel reflected as instability and collapse induced by excavation unloading, extrusion of working face, and severely deformed support. To tackle these problems, we propose a principle of “advance support, fast excavation, fast support, and fast closure” for tunnel construction. We summarize the construction measures applicable to the geological condition: 1) advance support with 15mΦ108 mm large pipe shed by using ST-20 pipe shed drilling rig, and grouting reinforcement of surrounding rock of working face; timely strong support with pressure-relieving anchor rods and long-lock-foot anchor pipes to restrain deformation; dynamic control and informatized construction by strengthening deformation monitoring of surrounding rock. Practice has proved that, for tunnels passing through crushed zone of high geostress, construction measures such as reinforcing the shallow surrounding rock and combining active support and passive support can effectively restrain the deep development and deformation of surrounding rock’s loose circle, hence guaranteeing safe and smooth construction.
Key words
diversion tunnel /
high in-situ stress /
loose consolidated structure /
pressure relief instability /
compressive deformation /
Central Yunnan Water Diversion Project
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 赵福善.兰渝铁路两水隧道高地应力软岩大变形控制技术[J].隧道建设,2014,34(6):546-553.
[2] 陈秀义.高地应力状态下硬质碎裂岩隧道变形机理研究[J].铁道标准设计,2017,61(11):56-60.
[3] 李守刚.关山特长隧道高地应力下硬岩大变形规律研究[J].人民长江,2015,46(12):48-52.
[4] 周亚萍,姜海波.深埋高地应力水工隧洞地应力特征及岩爆脆性破坏深度预测研究[J].隧道建设(中英文),2022,42(增刊1):321-330.
[5] 段江鹏,黄 玉,李培富,等.劣Ⅴ类围岩自进式超长大超前管棚施工技术[J].云南水力发电,2020,36(8):193-195.
[6] 汪 波,郭新新,何 川,等.当前我国高地应力隧道支护技术特点及发展趋势浅析[J].现代隧道技术,2018,55(5):1-10.
[7] 李 峰.高地应力构造破碎带隧道大变形灾变机制及控制技术研究[J].铁道科学与工程学报,2021,18(5):1222-1230.
[8] 韩常领,夏才初,徐 晨.软岩隧道挤压性大变形控制技术研究进展[J].地下空间与工程学报,2020,16(增刊1):492-505.
[9] 汪 波,喻 炜,刘锦超,等.交通/水工隧道中基于预应力锚固系统的及时主动支护理念及其技术实现[J].中国公路学报,2020,33(12):118-129.
[10]杨志刚,肖伯强,陈培帅,等.隧道三台阶开挖锁脚锚管倾角优化研究[J].人民长江,2017,48(16):60-62,72.
[11]左建平,孙运江,文金浩,等.深部巷道全空间协同控制技术及应用[J].清华大学学报(自然科学版),2021,61(8):853-862.
[12]杨静熙,陈长江,刘忠绪.高地应力洞室围岩变形破坏规律研究[J].人民长江,2016,47(6):37-41.