Huangdeng dam is the world’s tallest RCC (roller-compacted concrete) gravity dam under construction with a maximum height of 202 m. Affected by geological conditions and other factors, some engineering problems emerged in the construction process. Such problems include the quality fluctuation of raw materials, the contradiction between new test standard and original design indexes, as well as the coated-powder of aggregate. In this paper, the whole process of solving the above engineering problems by the third party inspection is introduced; the advantage of the third party inspection in additional quality control service is expounded, and the key role of the third party inspection in the quality control of RCC in Huangdeng Dam is revealed so as to offer reference for similar engineering construction.
Key words
quality control /
the third party inspection /
Huangdeng dam /
RCC /
coated-powder
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 国务院.国务院关于加快科技服务业发展的若干意见(国发〔2014〕49号)[EB/OL].[2018-07-29]. http://www.gov.cn/zhengce/content/2014-10/28/content_9173.htm.
[2] 朱 波,杨晓红,鄢凯军,等.水利工程质量第三方检测探讨[J].中国水能及电气化,2017(11):55-58.
[3] 陈小洁.广东水利实行工程质量100%第三方检测模式探讨[J].广东水利水电,2016(6):45-47.
[4] 徐利剑,郑 勇.江西省水利工程质量检测模式探讨[J].江西水利科技,2017(6):454-456.
[5] 靳荣勤,卿小燕,杨晓云.浅谈国内第三方检测机构的发展[J].现代测量与实验室管理,2014(2):62-64.
[6] 袁润章.胶凝材料学[M].武汉:武汉工业大学出版社,1989.
[7] 李兴贵,章恒全,陈晓月.高石粉人工砂原级配混凝土干缩性能试验研究[J].河海大学学报(自然科学版),2002,30(4):37-40.
[8] 蔡胜华,杨华全,周 浪,等.石粉含量对大坝碾压混凝土性能的影响[J].水力发电,2008,34(1):32-34.
[9] 郭 辉,郭文康,殷海波.粗骨料裹粉对黄登水电站混凝土性能影响试验研究[R].武汉:raybet体育在线
,2016.