Ground Subsidence Caused by Earth Pressure Balanced Rectangular Pipe Jacking Construction

YIN Ying-zi,ZHAO Qiang,CUI Fang-jing,JIA Qi,LIU Bin

Journal of Changjiang River Scientific Research Institute ›› 2019, Vol. 36 ›› Issue (1) : 95-101.

PDF(3023 KB)
PDF(3023 KB)
Journal of Changjiang River Scientific Research Institute ›› 2019, Vol. 36 ›› Issue (1) : 95-101. DOI: 10.11988/ckyyb.20170699
ROCK-SOIL ENGINEERING

Ground Subsidence Caused by Earth Pressure Balanced Rectangular Pipe Jacking Construction

  • YIN Ying-zi1,ZHAO Qiang1,CUI Fang-jing1,JIA Qi1,LIU Bin2
Author information +
History +

Abstract

The ground subsidence caused by rectangular soil pressure balanced pipe jacking construction in large section would damage the pavement structure layer, which has always been a difficulty and hot topic in geotechnical engineering. With the underground passage project in the Inner Mongolia University of Science and Technology as a case study, we analyzed the measured data of subgrade deformation and the applicability of Peck’s formula in predicting ground subsidence caused by rectangular pipe jacking, and also simulated the influence of pipe jacking construction in the presence of different soil depths on ground subsidence numerically. We found that, in general, measuring points in longitudinal direction on the jacking axis bulged at first, and then subsided and subsequently tended to be stable; in terms of cross section, pipe jacking affected an area within 10 meters of the axis, where the volume of settling trough occupied 90% of the total volume. When soil strata loss rate equals 0.4% and width parameter K of settling trough equals 0.4, the measured value agrees well with the results predicted by Peck’s formula. With the increase of overburden soil depth, the surface subsidence decreased gradually, and the settlement range gradually increased. The research results provide theoretical reference and application value for the construction of large cross-section soil pressure balanced rectangular pipe jacking and similar projects.

Key words

pipe jacking construction / rectangular earth pressure balance / underground passage / subgrade deformation / numerical simulation

Cite this article

Download Citations
YIN Ying-zi,ZHAO Qiang,CUI Fang-jing,JIA Qi,LIU Bin. Ground Subsidence Caused by Earth Pressure Balanced Rectangular Pipe Jacking Construction[J]. Journal of Changjiang River Scientific Research Institute. 2019, 36(1): 95-101 https://doi.org/10.11988/ckyyb.20170699

References

[1] 朱合华. 地下建筑结构[M]. 北京: 中国建筑工业出版社, 2006.
[2]PECK R B.Deep Excavation and Tunneling in Soft Ground. State of the Art Report[C]∥Proceedings of the Seventh International Conference on Soil Mechanics and Foundation Engineering. Mexico City, 1969: 225-281.
[3] O’REILLY MP, ROGERS CDF. Ground Movement Associated with Pipe Jacking and Trenching[C]∥Proceedings of the Fifth International Conference of No Dig 90 Rotterdam. Rotterdam, April 23-25, 1990: B1-B8.
[4] 邓长茂, 彭基敏. 软土地区顶管施工地表变形控制措施探讨[J]. 地下空间与工程学报, 2016, 12(4) : 1002-1007.
[5] 苏海东. 盾构法隧洞的平面非线性有限元分析[J]. raybet体育在线 院报, 2000,17(4) : 22-26.
[6] 杨转运. 超浅层顶管施工引起路基地层移动数值模拟[J]. 重庆建筑大学学报, 2008, 30(5) : 58-62.
[7] 龚尚龙, 杨转运, 陈思甜. 采用随机介质理论分析超浅层曲线顶管施工引起的地表沉降[J]. 重庆交通学院学报, 2005, 24(6) : 95-98.
[8] 孙 闯, 张建俊, 刘家顺, 等. 盾构隧道壁后注浆压力对地表沉降的影响分析[J]. raybet体育在线 院报, 2012, 29(11) : 68-72.
[9] 王 斌, 陈 帅, 陶柏峰, 等. 顶管穿越路堤实测地基变形和扰动程度分析[J]. 岩石力学与工程学报, 2010, 29(增1) : 2805-2812.
[10]沈明荣. 岩体力学[M]. 上海: 同济大学出版社, 1999: 109-111.
[11]万维燕. 土压平衡盾构过圆砾土层施工技术浅析[J]. 隧道/地下工程, 2011,(3): 33-36.