Design and Implementation of scheduling Management System for Water Diversion Project in East Zhejiang Province

SONG Li-song, YU Huan-fei, YAO Yun

Journal of Changjiang River Scientific Research Institute ›› 2017, Vol. 34 ›› Issue (6) : 29.

PDF(4366 KB)
PDF(4366 KB)
Journal of Changjiang River Scientific Research Institute ›› 2017, Vol. 34 ›› Issue (6) : 29. DOI: 10.11988/ckyyb.20160266
WATER RESOURCES AND ENVIRONMENT

Design and Implementation of scheduling Management System for Water Diversion Project in East Zhejiang Province

  • SONG Li-song, YU Huan-fei, YAO Yun
Author information +
History +

Abstract

The water diversion project in the east of Zhejiang province is featured with long route and complex operation management. In order to guarantee the safe and stable running and benefits of the project, we designed and developed a management system for the scheduling of the diversion project based on geological information system (GIS). The system has functions inclusive of information monitoring and management, scheduling management, project management, and administrative services. Network technology and database technology were employed for gathering and analyzing real-time monitoring information along the route. Methods of yearly superposition forecasting and dynamic correction were put forward based on time series analysis, and the workflow of scheduling was designed. The system has run stably and played a good role in the water diversion project.

Key words

water diversion project in East Zhejiang / scheduling management / information system / real time monitoring / water resources

Cite this article

Download Citations
SONG Li-song, YU Huan-fei, YAO Yun. Design and Implementation of scheduling Management System for Water Diversion Project in East Zhejiang Province[J]. Journal of Changjiang River Scientific Research Institute. 2017, 34(6): 29 https://doi.org/10.11988/ckyyb.20160266

References

[1] 王银堂,胡四一,周全林,等.南水北调中线工程水量优化调度研究.水科学进展,2001,12(1):72-80.
章燕喃,田富强,胡宏昌,等,南水北调来水条件下北京市多水源联合调度模型研究.水利学报,2014,45(7):844-849.
黄会勇,毛文耀,范 杰,等.南水北调中线一期工程输水调度方案研究[J].人民长江,2010,41(16):8-13.
宋立松,王 挺,程海洋,等.水库安全巡查实时监管系统设计和实现,水电能源科学,2013,(1):167-170.
王国利,彭 勇,何 斌,等.基于B/S+C/S模式的防洪调度决策支持系统研究及其应用.大连理工大学学报,2010,(2):258-263.
周潮洪,常守权.永定河实时调度系统的建立.水利学报,2003,34(8):101-104,110.
[7] 杨永生,刘聚涛,李荣昉,等.基于水量分配方案的非汛期水量调度方案编制——以江西抚河流域为例[J].人民长江,2011,42(15):9-12.
邓 坤,刘聚涛,成静清,等.赣江流域基于水量分配方案的非汛期水量调度方案编制方法研究.节水灌溉,2012,(7):60-62.
[9] 闰大鹏,王 莉.黑河干流生态水量调度方案[J].人民黄河,2011,33(1):54-58.
梁国华,李 娜,彭 勇,等.基于Hibernate的辽河流域防洪调度系统.水利水电科技进展,2008,28(6):62-65.
彭 勇,周惠成,梁国华.洪水预报调度软件的设计模式研究.哈尔滨工业大学学报,2009,41(9):179-183.
陈炼钢,施 勇,钱 新,等.J2EE耦合GIS&FLEX的淮河流域水环境预警与管理系统研发.水力发电学报,2013,(2):108-113.
[13]李 燕,滕 阳.南水北调中线干线工程水量调度系统设计与研究[J].水利水电技术,2008,39(5):82-84.
[14]田学民,解建仓,菅玉敏.基于Web的水量调度系统研究与实现[J].宁夏工程技术,2009,8(3):217-220.
孙文萍,陈 静,张李荪.三维动画技术在峡江水利枢纽的应用与实现.江西水利科技,2009,35(2):128-130.
刘 健,于 辉,韩 勇,等.基于VRMap的风景区虚拟仿真系统开发.系统仿真学报,2006,18(1):130-133.
王 挺,宋立松,方琛亮,等.基于Google Map的水库安全生产监管系统.浙江水利科技,2013,(5):7-9.
张泽锋,宋立松,程海洋,等.水库安全隐患排查治理信息管理系统设计. 浙江水利科技,2013,(1):68-70.
PDF(4366 KB)

Accesses

Citation

Detail

Sections
Recommended

/

Baidu
map