Application of Entropy Weight and Set Pair Analysis Theory to Risk Assessment of Dam Operation

WU Sheng-wen ,QIN Peng ,GAO Jian ,YAN Xiao-qun

Journal of Changjiang River Scientific Research Institute ›› 2016, Vol. 33 ›› Issue (6) : 36-40.

PDF(1073 KB)
PDF(1073 KB)
Journal of Changjiang River Scientific Research Institute ›› 2016, Vol. 33 ›› Issue (6) : 36-40. DOI: 10.11988/ckyyb.20151101
ENGINEERING SAFETY AND DISASTER PREVENTION

Application of Entropy Weight and Set Pair Analysis Theory to Risk Assessment of Dam Operation

  • WU Sheng-wen1,QIN Peng1,2,GAO Jian1,YAN Xiao-qun1
Author information +
History +

Abstract

Establishing proper evaluation indexes and criterion and making accurate judgment on dam’s operational risk according to the real operation condition is important for operation management in water conservancy projects. However, complex fuzzy, nonlinear relations exist between the evaluation indexes and criterion. Set pair analysis method has priority in quantitatively dealing with uncertainty problems between multifactors, hence it can be used for the evaluation of dam’s operational risk. An assessment model for dam’s operational risk based on entropy theory and set pair analysis theory was built. The index weights were determined through calculation of information provided by each factor. The model was applied to evaluate the operation risk of a dam, and the safety level of the dam was obtained and the development trend of the risk was predicted. Results showed that the present method based on set pair analysis and entropy theory is simple and feasible, scientific and reasonable, and offers new idea for the assessment of dam’s operation risk.

Key words

dam / operation safety / risk assessment / information entropy / set pair analysis

Cite this article

Download Citations
WU Sheng-wen ,QIN Peng ,GAO Jian ,YAN Xiao-qun. Application of Entropy Weight and Set Pair Analysis Theory to Risk Assessment of Dam Operation[J]. Journal of Changjiang River Scientific Research Institute. 2016, 33(6): 36-40 https://doi.org/10.11988/ckyyb.20151101

References

[1] 吴中如. 中国大坝的安全和管理[J]. 中国工程科学,2000,2(6):36-39.
[2]郑小武, 刘立. 基于集对分析的土石坝安全风险评 价[J]. 人民黄河,2013,35(11):93-95,98.
[3]马福恒. 病险水库大坝风险分析与预警方法[D].南京:河海大学,2006.
[4]李晓璐,李春雷,李德玉,等. 基于多层次模糊分析法的大坝安全评价研究[J]. 人民长江,2010,41(17): 92- 95.
[5]杨灿, 郭曙光, 陈建康. 重力坝安全运行风险评 价[J]. 吉林水利,2015,(3):5-9.
[6]SU Huai-zhi, QIN Peng, QIN Zhi-hai. A Method for Evaluating Sea Dike Safety[J]. Water Resource Manage, 2013, 27(10): 5157-5170.
[7]WEI Yong, XU Kai-Li. Application of Set Pair Analysis on Safety Evaluation of Tailing Dam Stability[J]. Journal of Safety Science & Technology, 2012,8(9):101-105.
[8]张国栋,李雷,彭雪辉. 基于大坝安全鉴定和专家经验的病险程度评价技术[J].中国安全科学学报,2008,(9):158-166.
[9]SL258—2000,水库大坝安全评价导则[S]. 北京:中国水利水电出版社,2000.
[10] 赵克勤. 集对分析及其初步应用[M]. 杭州:浙江科学技术出版社, 2000.
[11]〖KG*3〗DECAI H, KEQIN Z, PING Z. Uncertainty Network Planning Technique Using the Connection Number a+bi of Set Pair Analysis[C]∥Proceedings of the 3rd World Congress on Intelligent Control and Automation. IEEE, Hefei, China. June 28-July 2, 2000:1997-2000.
[12] 秦植海, 秦鹏. 高边坡稳定性评价的模糊层次与集对分析耦合模型[J]. 岩土工程学报,2010,32(5): 706- 711.
[13] WANG T, CHEN J S, WANG T, et al. Entropy Weight-set Pair Analysis Based on Tracer Techniques for Dam Leakage Investigation[J]. Natural Hazards, 2014, 76(2): 1-21.
[14] 邱宛华. 管理决策与应用熵学[M].北京:机械工业出版社,2002:193-196.
[15] TZENG S R, KALODIMOS C G. Protein Activity Regulation by Conformational Entropy[J]. Nature, 2012, (488): 236-240.
[16] TAO J, FU M, SUN J, et al. Multifunctional Assessment and Zoning of Crop Production System Based on Set Pair Analysis: A Comparative Study of 31 Provincial Regions in Mainland China[J]. Communications in Nonlinear Science & Numerical Simulation,2014, 19(5):1400-1416.
[17] 苏怀智, 孙小冉. 混凝土坝渗流性态综合评价与趋势预估模型研究[J]. 人民长江,2013,(22): 95-99, 110.
[18] 秦鹏,张喆瑜,秦植海,等. 滑坡体监测数据的改进变维分形——人工神经网络耦合预测模型[J].raybet体育在线 院报,2012,29(3):29-33.
PDF(1073 KB)

Accesses

Citation

Detail

Sections
Recommended

/

Baidu
map