%0 Journal Article %A SUN Gui-kai %A SHI Rui %A LIU Si-yi %A WANG Guo-shuai %A ZHAO Rong-na %A MO Chong-xun %T Optimal Scheduling of Reservoir Based on Long-term and Medium Long-term Nested Model %D 2022 %R 10.11988/ckyyb.20210289 %J Journal of Yangtze River Scientific Research Institute %P 23-28 %V 39 %N 8 %X The comprehensive benefit of reservoir is not high due to different time scales in the process of optimal scheduling.In view of this,a nested model of multi-objective optimal scheduling of reservoir is built with both flood control and operational benefit as objectives by nesting the long-term and medium-to-long-term optimal scheduling of reservoir.The multi-objective problem is transformed into a single objective problem of solving the maximum power generation after the flood control objective is transformed into a hard constraint by the constraint method.In terms of algorithm,the long-term optimal scheduling is solved by dynamic programming algorithm,and the medium-to-long-term optimal scheduling is solved by genetic algorithm.The optimization effect of the nested model is verified with Chengbihe reservoir as a case study.The results demonstrate that under the premise of meeting the flood control objectives,the nested model scheme is more effective than the long-term scheme and the actual operation scheme,which verifies the superiority of the nested model. %U http://ckyyb.crsri.cn/EN/10.11988/ckyyb.20210289