以宜巴高速公路峡口隧道为工程实例,针对高地应力软岩隧道施工大变形控制问题,运用数值分析分别采用环形开挖留核心土法、三台阶法、双侧壁导洞法和CRD法对峡口隧道大变形段典型断面进行开挖模拟,获得了4种不同施工工法下洞身变形、塑性区分布情况;并以此判断围岩的稳定情况,对4种施工工法的优劣进行分析与研究。研究结果表明CRD法对控制围岩稳定效果最好。最后结合工程实际,通过支护结构受力监测,洞周累计变形量与变形速率量测,验证了选用的施工工法及工艺的合理性,对我国高地应力软岩隧道的建设进行了有益的探索。
Abstract
To investigate the big deformation control for soft rock tunnel construction with high geostress, we simulated the excavation of typical sections with big deformation by numerical approaches. Xiakou tunnel of Yichang-Badong Highway was taken as a case study. We adopted four construction techniques(method of ring cutting while preserving core soil, three-step method, two-sided pilot-hole method and CRD method) in the excavation simulation. By analyzing the tunnel deformation and plastic zone distribution respectively of these four techniques, we determined the stability of the surrounding rock, and analysed the advantages and shortcomings of the four methods. Results show that CRD method works best in terms of rock stability control. Finally, we verified the rationality of the construction technique by monitoring forces on the supporting structure and measuring the cumulative deformation and deformation rate. This research is an exploration on China’s soft rock tunnel construction with high geostress.
关键词
高地应力 /
软岩隧道 /
施工工法 /
数值分析
Key words
high geostress /
soft rock tunnel /
construction method /
numerical analysis
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 刘 高,张帆宇,李新召,等. 木寨岭隧道大变形特征及机理分析[J]. 岩石力学与工程学报,2005,24(A02):5521-5526. (LIU Gao, ZHANG Fan-yu, LI Xin-zhao, et al. Research on Large Deformation of Muzhailing Tunnel and Its Mechanism[J]. Chinese Journal of Rock Mechanics and Engineering, 2005,24(A02):5521-5526. (in Chinese))
[2] 周乾刚,方俊波. 乌鞘岭隧道岭脊段控制千枚岩大变形快速施工[J].隧道建设,2007,27(4):43-47. (ZHOU Qian-gang, FANG Jun-bo. Rapid Tunnel Construction Technology to Control Huge Deformation of Phyllite Ground: Case Study on Ridge Section of Wushaoling Tunnel[J]. Tunnel Construction, 2007,27(4): 43-47. (in Chinese))
[3] 邹 翀,张民庆,李沿宗,等. 高地应力软岩隧道施工变形控制方法试验研究[J]. 隧道建设,2012,32(1):5-10. (ZOU Chong, ZHANG Min-qing, LI Yan-zong, et al. Trial Research on Deformation Control during Tunneling in Soft Ground with High Geo-stress[J]. Tunnel Construction, 2012,32(1): 5-10. (in Chinese))
[4] 朱汉华,尚岳全,杨建辉,等. 公路隧道设计与施工新法及其应用[M]. 北京:人民交通出版社,2002:198-204. (ZHU Han-hua, SHANG Yue-quan, YANG Jian-hui, et al. New Methods in Design and Construction of Tunnel and Their Application[M]. Beijing: China Communications Press, 2002:198-204. (in Chinese))
[5] 李 权. ANSYS在土木工程中的应用[M]. 北京:人民邮电出版社,2005. (LI Quan. ANSYS in Civil Engineering[M]. Beijing: Posts & Telecom Press, 2005. (in Chinese))
[6] 刘 波,韩彦辉. FLAC原理、实例与应用指南[M]. 北京:人民交通出版社,2005.(LIU Bo, HAN Yan-hui. FLAC: Theory, Example and Application[M]. Beijing: China Communications Press,2005.(in Chinese))
[7] 马万权,程崇国,张鹏勇. 阳宗隧道试验段动态开挖过程的数值模拟[J]. 地下空间,2003,23(3):256-259. (MA Wan-quan, CHENG Chong-guo, ZHANG Peng-yong. Numerical Simulation of Dynamic Emulation on Construction Process in Yangzong Highway Tunnel[J]. Underground Space, 2003,23(3):256-259. (in Chinese))
[8] 夏永旭,王永东. 隧道结构力学计算[M]. 北京:人民交通出版社,2004. (XIA Yong-xu, WANG Yong-dong. Mechanical Calculation of Tunnel Structure[M]. Beijing: China Communications Press,2004.(in Chinese))
[9] 张延新,蔡美峰,乔 兰,等. 高速公路隧道开挖与支护力学行为研究[J]. 岩石力学与工程学报,2006,25(6):1285-1289. (ZHANG Yan-xin, CAI Mei-feng, QIAO Lan, et al. Study on Mechanical Response to Excavation and Support of Expressway Tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2006,25(6): 1285-1289. (in Chinese))
[10]朱赞成,华 渊,连俊英,等. 软岩隧道变形数值模拟与实测研究[J]. 铁道建筑, 2004, (11):34-36.(ZHU Zan-cheng, HUA Yuan, LIAN Jun-ying, et al. Numerical Simulation and Experimental Study on the Deformation of Soft Rock Tunnel[J]. Railway Engineering, 2004, (11): 34-36. (in Chinese))
基金
三峡大学研究生创新基金资助项目(2013CX020);三峡大学土木建筑学院培优基金项目(PY201413)