无粘结环锚预应力衬砌张拉工艺足尺模型试验研究

陆岸典, 唐欣薇, 严振瑞, 麦胜文, 姚广亮

raybet体育在线 院报 ›› 2024, Vol. 41 ›› Issue (3) : 142-147.

PDF(5320 KB)
PDF(5320 KB)
raybet体育在线 院报 ›› 2024, Vol. 41 ›› Issue (3) : 142-147. DOI: 10.11988/ckyyb.20221363
水工结构与材料

无粘结环锚预应力衬砌张拉工艺足尺模型试验研究

  • 陆岸典1, 唐欣薇2, 严振瑞3, 麦胜文2, 姚广亮3
作者信息 +

Full-scale Model Test on Tensioning Technology of Prestressed Lining with Unbonded Circular Anchor

  • LU An-dian1, TANG Xin-wei2, YAN Zhen-rui3, MAI Sheng-wen2, YAO Guang-liang3
Author information +
文章历史 +

摘要

针对预应力衬砌张拉过程中易出现应力集中而导致张拉裂缝的现象,通过开展洞外地面足尺模型试验,提出了分级分步张拉顺序和质量控制指标。首先根据钢绞线摩阻测试计算出摩擦系数,随后应用上述张拉顺序和质量控制方法进行自动张拉,并采用磁通量传感器和混凝土应变计分别对钢绞线和内衬混凝土的应力变化开展实测。现场张拉试验结果表明:①钢绞线沿程预应力损失约16.3%,采用的双层钢绞线在实践中可保证较高的有效预应力;②对锚具槽进行分级分步张拉,可使内衬混凝土获得较均匀的封闭环向压应力环,平均压应力达-10.9 MPa;③提出的3项控制指标可进行量化管理,结合自动张拉技术可有效地保证张拉质量。

Abstract

This study focuses on improving stress distribution and preventing crack formation during the tensioning process. To achieve this, we conducted full-scale model test and proposed a tension sequence and quality control indexes. Initially, we calculated the friction coefficient based on steel strand friction test. Subsequently, we applied the tension sequence and quality control indexes using an automated tension system. To monitor stress changes, we used elastomagnetic sensors for the steel strand, and strain gauges for the lining concrete. Field tensile tests yield the following key findings: 1) The steel strand experiences a prestress loss of approximately 16.3%. However, by utilizing double-layered steel strands, we ensure a highly effective prestress in practical applications. 2) Applying the proposed tension sequence in the anchorage slots results in the lining concrete achieving a relatively uniform annular compressive stress, with an average compressive stress of -10.9 MPa. 3) The three control indexes we recommend can be quantitatively managed, and when combined with automated tension technology, they effectively guarantee the quality of tension.

关键词

无粘结环锚 / 预应力内衬 / 分级分步张拉 / 质量控制 / 足尺模型试验

Key words

unbonded circular anchor / prestressed lining / sequential tensioning / quality control / full-scale model test

引用本文

导出引用
陆岸典, 唐欣薇, 严振瑞, 麦胜文, 姚广亮. 无粘结环锚预应力衬砌张拉工艺足尺模型试验研究[J]. raybet体育在线 院报. 2024, 41(3): 142-147 https://doi.org/10.11988/ckyyb.20221363
LU An-dian, TANG Xin-wei, YAN Zhen-rui, MAI Sheng-wen, YAO Guang-liang. Full-scale Model Test on Tensioning Technology of Prestressed Lining with Unbonded Circular Anchor[J]. Journal of Changjiang River Scientific Research Institute. 2024, 41(3): 142-147 https://doi.org/10.11988/ckyyb.20221363
中图分类号: TV672.1   

参考文献

[1] 李晓克, 陈 震, 赵 洋, 等. 压力隧洞无粘结预应力混凝土衬砌[M]. 北京: 中国水利水电出版社, 2019.(LI Xiao-ke, CHEN Zhen, ZHAO Yang, et al. Unbonded Prestressed Concrete Lining for Pressure Tunnel[M]. Beijing: China Water & Power Press, 2019.(in Chinese))
[2] 皮 进, 曹瑞琅, 赵宇飞. 无粘结环锚预应力混凝土衬砌应力状态分析[J]. 人民长江, 2018, 49(7): 63-67.(PI Jin, CAO Rui-lang, ZHAO Yu-fei. Stress State Analysis of Pre-stressed Concrete Lining with Un-bonded Annular Anchors[J]. Yangtze River, 2018, 49(7): 63-67.(in Chinese))
[3] 梁 岩, 罗小勇, 万翱宙. 南水北调穿黄隧洞工程预应力混凝土施工技术[J]. 水利水电科技进展, 2014, 34(2): 54-58.(LIANG Yan, LUO Xiao-yong, WAN Ao-zhou. Construction Technique of Circular Bonded Pre-stressed Concrete Using Post-tension Method in Yellow River-crossing Tunnel Construction in South-to-north Water Diversion Project[J]. Advances in Science and Technology of Water Resources, 2014, 34(2): 54-58.(in Chinese))
[4] 亢景付,沈兆伟,荆 锐,等.环锚预应力混凝土衬砌锚具槽区域应力状态分析[J].水电能源科学,2016,34(7):108-111.(KANG Jing-fu,SHEN Zhao-wei,JING Rui,et al. Stress State Analysis of Anchorage Slot Area of Pre-stressed Concrete Lining[J]. Water Resources and Power,2016,34(7):108-111.(in Chinese))
[5] 李晓克,严振瑞,黄建添,等.浅埋式预应力混凝土压力管道结构设计与技术经济比较[J]. 水利水电技术,2002,33(6):20-25,72.(LI Xiao-ke,YAN Zhen-rui,HUANG Jian-tian,et al. Design and Technical Economy Analysis of Prestressed Concrete Penstock Shallow Buried under Earth[J]. Water Resources and Hydropower Engineering,2002,33(6):20-25,72.(in Chinese))
[6] 诸葛妃,赵顺波.浅埋有压水工隧洞无粘结预应力衬砌应力试验分析[J].水利水电技术,2010,41(10):41-44,47.(ZHUGE Fei,ZHAO Shun-bo.Analysis on Stress Experiment of Non-cohesive Pre-stressed Lining for Shallow-buried Hydraulic Pressure Tunnel[J]. Water Resources and Hydropower Engineering,2010,41(10):41-44, 47.(in Chinese))
[7] WANG Y,CAO R, PI J,et al.Mechanical Properties and Analytic Solutions of Prestressed Linings with Un-bonded Annular Anchors under Internal Water Loading[J].Tunnelling and Underground Space Technology,2020,97:103244.
[8] 齐文彪, 刘 阳. 吉林中部供水工程关键技术问题综述[J]. raybet体育在线 院报, 2012, 29(8): 1-6.(QI Wen-biao, LIU Yang. Summary of Key Technical Issues of the Water Supply Project from Songhua River to the Central Cities of Jilin Province[J]. Journal of Yangtze River Scientific Research Institute, 2012, 29(8): 1-6.(in Chinese))
[9] 刘 阳,王 倩,刘 阳.引松隧洞预应力钢筋混凝土衬砌结构计算分析[J].raybet体育在线 院报,2011,28(5):63-66.(LIU Yang,WANG Qian,LIU Yang.Calculation of the Lining of Prestressed Reinforced Concrete in Pressurized Water Conveyance Tunnel[J]. Journal of Yangtze River Scientific Research Institute,2011,28(5):63-66.(in Chinese))
[10] HE H, TANG X, LIN S,et al. Field Experiments and Numerical Simulations for Two Types of Steel Tube Lining Structures under High Internal Pressure[J]. Tunnelling and Underground Space Technology, 2022, 120: 104272.
[11] 亢景付,胡玉明,侯新华.小浪底排沙洞混凝土衬砌不同阶段预应力变化实测分析[J].水力发电学报,2003,22(2):88-96.(KANG Jing-fu,HU Yu-ming, HOU Xin-hua.Aalysis of Prestress at Different Periods in Concrete Lining of Xiaolangdi Sediment Flushing Tunnels[J]. Journal of Hydroelectric Engineering,2003,22(2):88-96.(in Chinese))
[12] 亢景付, 殷保合, 林秀山. 小浪底排沙洞混凝土衬砌预应力效果分析[J]. 人民黄河, 2002, 24(12): 28-29.(KANG Jing-fu, YIN Bao-he, LIN Xiu-shan. Analysis of Prestress Effect of Concrete Lining in Xiaolangdi Desilting Tunnel[J]. Yellow River, 2002, 24(12): 28-29.(in Chinese))
[13] 符志远. 后张预应力圆形隧洞衬砌纵向应力计算[J]. 人民长江, 2004, 35(1): 7-9, 55.(FU Zhi-yuan. Longitudinal Stress Computation of Post-tensioned Prestressing Concrete Circular Tunnel[J]. Yangtze River, 2004, 35(1): 7-9, 55.(in Chinese))
[14] 皮 进,王玉杰,齐文彪,等.无黏结环锚预应力混凝土衬砌张拉工艺研究[J].水利水电技术,2018,49(7):81-87.(PI Jin,WANG Yu-jie,QI Wen-biao,et al. Tensioning Technology of Pre-stressed Concrete Lining with Unbonded Circular Anchor[J]. Water Resources and Hydropower Engineering,2018,49(7):81-87.(in Chinese))
[15] 谭少海. 吊索拱桥整体自动张拉技术应用研究[J]. 中外公路, 2018, 38(5): 115-119.(TAN Shao-hai. Application Research on Automatic Global Tensioning Technology of Cable Arch Bridge[J]. Journal of China & Foreign Highway, 2018, 38(5): 115-119.(in Chinese))
[16] JGJ 92—2016, 无粘结预应力混凝土结构技术规程[S]. 北京: 中国建筑工业出版社, 2016.(JGJ 92—2016, Technical Specification for Concrete Structures Prestressed with Unbonded Tendons[S]. Beijing: China Architecture & Building Press, 2016.(in Chinese))
[17] 龚壁新, 刘允芳, 罗超文, 等. 后张预应力锚索摩阻试验研究[J]. raybet体育在线 院报, 1992,9(1): 65-72.(GONG Bi-xin, LIU Yun-fang, LUO Chao-wen, et al. A Test Study on Friction Resistance Value of Post-tensioned Tendon[J]. Journal of Yangtze River Scientific Research Institute, 992,9(1): 65-72.(in Chinese))
[18] 姜小兰,吴 浪,孙绍文,等.南水北调穿黄隧洞内衬预应力锚索应力应变试验研究[J].raybet体育在线 院报,2010,27(4):61-65.(JIANG Xiao-lan,WU Lang,SUN Shao-wen,et al.Investigation on Stress-strain of Prestressed Anchor Cable in Internal Lining of Tunnel of South-north Water Transfer Project through Yellow River[J]. Journal of Yangtze River Scientific Research Institute,2010,27(4):61-65.(in Chinese))

基金

广东省重点领域研发计划项目(2019B111108001);珠江三角洲水资源配置工程科研课题(CD88GC0220200034)

PDF(5320 KB)

Accesses

Citation

Detail

段落导航
相关文章

/

Baidu
map