院报 ›› 2019, Vol. 36 ›› Issue (2): 8-12.DOI: 10.11988/ckyyb.20170861

• 江湖泥沙与治理 • 上一篇    下一篇

荆江河段与洞庭湖水系的采砂量计算分析

李志威1,2,符蔚1,胡旭跃1,2,黄草1,2,钟一丹3   

  1. 1.长沙理工大学 水利工程学院,长沙 410114;
    2.长沙理工大学 水沙科学与水灾害防治湖南省重点实验室,长沙 410114;
    3.国务院南水北调工程建设委员会办公室 政策及技术研究中心,北京 100038
  • 收稿日期:2017-08-02 修回日期:2017-09-29 出版日期:2019-02-01 发布日期:2019-03-11
  • 通讯作者: 胡旭跃(1962-),男,湖南长沙人,教授,博士,主要从事河流动力学与航道工程方面的研究。E-mail: huxuyue62@163.com
  • 作者简介:李志威(1984-),男,湖北云梦人,副研究员,博士,主要从事河流动力学方面的研究。E-mail: lzhiwei2009@163.com
  • 基金资助:
    湖南省科技重大专项(2018SK1010);湖南省教育厅优秀青年项目(16B010);河南省自然科学基金青年项目(2018JJ3547)

Calculation and Analysis of Sand Excavation Quantity in Jingjiang River Reach and Dongting Lake’s River Network

LI Zhi-wei1,2, FU Wei1, HU Xu-yue1,2, HUANG Cao1,2, ZHONG Yi-dan3   

  1. 1.School of Hydraulic Engineering, Changsha University of Science & Technology, Changsha 410114, China;
    2.Key Laboratory of Water-Sediment Sciences and Water Disaster Prevention of Hunan Province, Changsha University of Science & Technology, Changsha 410114, China;
    3.Research Center for Policy and Technology,Office of the South-to-North Water Diversion Projiect Commission of the State Council, Beijing 100038, China
  • Received:2017-08-02 Revised:2017-09-29 Online:2019-02-01 Published:2019-03-11

摘要: 针对当前荆江河段和洞庭湖水系严峻的采砂形势,根据遥感影像和本地区历年水泥产量,采用体积计算公式、水泥产量估算法、采砂船只估算法这3种方法计算荆江河段和洞庭湖水系的年采砂量,并对3种计算结果的误差进行分析。结果表明:2015年荆江河段年采砂量约(2.6~3.0)×107 t,近5 a的采砂量变化较小;洞庭湖区及湘资沅澧四水水系的年采砂量约1.3×108 t,近3 a的采砂量变化较小。本计算结果对于定量估算荆江河段和洞庭湖水系的采砂量,加强采砂管理具有参考价值。

关键词: 荆江河段, 洞庭湖水系, 采砂量, 遥感影像, 误差分析

Abstract: In view of the severe situation of sand excavation in Jingjiang River reach (middle of the Yangtze River) and Dongting Lake’s river network, we estimate the annual sand excavation quantity of Jingjiang River reach and Dongting Lake’s river network(mainstream of Xiangjiang River, Zijiang River, Yuanjiang River, and Lishui River) using three methods, namely, volumetric formula, conversion of cement production, and sand mining ships based on remote sensing images in this region. We also analyzed the errors of these three methods as well. Results demonstrate that the annual quantity of sand excavation in the Jingjiang River reach is around (2.6-3.0)×107 t in 2015 with slight changes in the last five years; the annual quantity of sand excavation in the Dongting Lake’s river network is around 1.3×108 t in 2015 with slight changes in the last three years. The estimation above is of importance to the evaluation and management of sand excavation in Jingjiang River reach and Dongting Lake region.

Key words: Jingjiang River Reach, Dongting Lake’s river network, sand excavation quantity, remote sensing images, error analysis

中图分类号: 

Baidu
map