为确定高填方涵洞加筋减载效果的影响因素及影响规律,在介绍加筋桥减载法及其减载机理的基础上,通过对加筋减载的高填方涵洞的数值模拟,研究了不同格栅层数、减载孔不同宽度、高度和侧壁角度以及减载孔不同填料性质时高填方涵洞的土压力变化规律,分析了高填方涵洞加筋减载的效果。结果表明:减载孔高度和减载孔填料模量对减载效果有较大的影响,减载孔高度越高,减载孔填料模量越低,减载效果越显著;减载孔宽度、格栅层数和减载孔填料的内摩擦角对减载效果影响较小,但减载孔宽度的增加使涵洞受力更均匀,有利于减小结构物内力。
Abstract
In the aim of identifying the influencing factors and their effects on load reduction effect for culvert beneath high fill, the method and mechanism of load reduction by reinforcement bridge are introduced firstly. On this basis, by means of numerical simulation, the influences of number of geogrid layer, width, height and lateral slope angle of load reduction ditches, as well as properties of filling material on the vertical earth pressure and the load reduction effect are investigated. Results suggest that the modulus of the filling material in the load reduction ditch and the height of the ditch have great effect on the load reduction. Ditches of larger height and lower material modulus lead to significantly better load reduction effect and less vertical earth pressures on the crown of culverts. The width of load reduction ditch, number of geogrid layer and internal friction angle of backfill material have little effect on the load reduction, but the increase of the width of the load reduction ditch results in more uniform internal forces for the culvert and a decrease of bending moment.
关键词
高填方涵洞 /
加筋减载 /
土压力 /
格栅 /
数值模拟
Key words
culvert with high fill /
load reduction by reinforcement /
earth pressure /
geogrid /
numerical simulation
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] BENNETT R M, WOOD S M, DRUMM E C, et al. Vertical Loads on Concrete Box Culverts under High Embankments. Journal of Bridge Engineering, 2005, 10(6): 643-649.
KANG J, PARKER F, YOO C H. Soil-structure Interaction and Imperfect Trench Installations for Deeply Buried Concrete Pipes. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(3): 277-285.
DANCYGIER A N, YANKELEVSKY D Z. A Soft Layer to Control the Soil Arching above a Buried Structure. Engineering Structures, 1996, 18(5): 378-386.
王晓谋,顾安全. 上埋式管道垂直土压力的减荷措施. 岩土工程学报, 1990, 12(3): 83-89.
LEE J H,SALGADO R,BERNAL A,et al.Shredded Tires and Rubber-sand as Lightweight Fill.Journal of Geote-chnical Geoenvironmental Engineering,1999,125(2):132-141.
杨锡武,张永兴. 山区公路高填方涵洞加筋桥减载方法及其设计理论研究. 岩石力学与工程学报, 2005, 24(9): 1561-1571.
杨锡武. 山区公路高填方涵洞土压力计算方法与结构设计. 北京: 人民交通出版社, 2006.
包承纲,汪明远,丁金华. 格栅加筋土工作机理的试验研究.raybet体育在线
院报, 2013,30(1):34-41.
JTG D60—2004,公路桥涵设计通用规范.北京:人民交通出版社,2004.
基金
国家自然科学基金项目(51678223,51678224);黄土地区公路建设与养护技术交通行业重点实验室开放课题(KLTLR-Y12-11);湖北工业大学高层次人才计划项目(YXQN2017001,BSQD12153)