为研究高桩码头桩基受力及结构损伤,对某高桩码头3类典型断面进行有限元数值模拟,并对基桩进行承载力计算分析;之后,将数值模拟结果与现场桩基结构损伤检测结果作比较,二者吻合较好,从而验证了理论分析的正确性,并最终给出受损部位的加固措施。根据基桩承载力有限元分析及实测结果,可以断定基桩顶部(距桩帽下方1~2 m)为最易受损部位;对于码头3种断面类型,应尽量避免使用断面1、断面2的形式,原因是这2类断面的水平承载力太小,极易受水平力作用而在使用过程中发生损坏;提出2种加固基桩受损部位的措施,增大桩帽截面法和钢抱箍法,但在具体修复时,应根据实际情况在考虑时间因素、经济效益的前提下,认真总结比较这2种措施的优缺点,灵活选用修复措施,对桩基受损部位进行妥善处理。
Abstract
In order to study the stress and structural damage of high-piled wharf, we simulated three kinds of typical sections of a high-piled wharf by using finite element method, and analyzed the pile bearing capacity. Then, we compared the simulated result with the damage detection result of pile foundation structure, and the results coincide with each other, verifying the correctness of theoretical analysis. Finally, we gave the reinforcement measures for the damaged parts. According to the finite element analysis of pile bearing capacity and measured results, we concluded that pile top (1-2 m from beneath the pile cap) is the most vulnerable part. For the three typical types of cross sections, we should try to avoid using the forms of section one and section two. Because the horizontal bearing capacity of the two types of cross section is too small so that the piles are likely to be damaged by horizontal force in the process of use. Besides, we put forward two measures of reinforcing the damage locations of piles by enlarging pile cap section and by steel hoop. But in concrete repair, under the premise of considering time factor and economic benefits,we should flexibly choose repair measures based on summarizing and comparing the advantages and disadvantages of various measures to treat the damaged positions of the piles properly.
关键词
桩基工程 /
高桩码头 /
有限单元法 /
结构损伤 /
承载力分析 /
加固措施
Key words
pile foundations /
high-piled wharf /
finite element method /
structural damage /
bearing capacity analysis /
reinforcement measures
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 宋玉普,王茂林,赵国藩.高桩码头大管桩桩帽力学性能的三维非线性有限元分析[J].海洋学报,1996,18(2):130-137.
[2] 陈 强,冯 涛,赵立鹏,等.受损高桩码头结构承载能力“论证方法”探讨[J].中国港湾建设,2003,126(5):25-28.
[3] 孙英学,冉昌国.高桩码头结构损伤机理浅析及其健康监测技术简介[J].水文地质工程地质,2005,5:110-112.
[4] 王官胜,董业宗,赵传耀,等.高桩码头基桩承载力的计算与分析[J].水运工程,2007,399:53-57.
[5] 曾庆敦,朱兴元,林 慰,等.高桩码头承载能力的有限元分析[J].中山大学学报(自然科学版),2008,47(增2):126-130.
[6] 时蓓玲,吴 锋,孙 穆.高桩码头结构承载力检测与评估方法[J].中国港湾建设,2009,159(1):1-3.
[7] 时蓓玲,吴 锋,俞立新,等.高桩码头结构承载力检测评估的典型工程实例[J].水运工程,2009,428(6):65-68.
[8] 刘晓平,凌 威,林积大,等.底梁式全直桩高桩码头水平力作用下的特性分析[J].中国港湾建设,2012,179(2):13-15.
[9] 蒋建平,魏建华,马 恒.高桩码头承载特性三维数值模拟[J].上海海事大学学报,2014,35(1):84-87.
[10]孙熙平,张 勇,郑锋勇,等.高桩码头基桩竖向承载力原型试验研究[J].岩土力学,2014,35(9):2609-2615.
[11]DONAHUE M, DICKENSON S, MILLER T, et al. Implications of the Observed Seismic Performance of a Pile-supported Wharf for Numerical Modeling[J]. Earthquake Spectra, 2005, 21(3):617-34.
[12]BIRDY J, DODD L. Design of Wharves for Seismic Regions[J]. Concrete International,1999, 21(12):28-32.
[13]International Navigation Association. Seismic Design Guidelines for Port Structures[J]. London (UK): Taylor and Francis Group, 2001.
[14]LOBEDAN F R, LABASCO T, OGUNFUNMI K. Wharf and Embankment Strengthening Program at the Port of Oakland[J]. Soil Dynamics & Earthq Enguake Engineering, 2002, 22:1125-1130.
[15]IAI S, SUGANO T. Soil-structure Interaction Studies Through Shaking Table Tests[C]∥ISSMGE Technical Committe. Proceedings of the 2nd International Conference on Earthquake Geotechnical Engineering. Lisbon, Portugal, June 21-25,1999: 927-940.
[16]陶桂兰,陈 祥,王 定. 高桩码头叉桩布置形式抗震性能分析[J]. 河海大学学报(自然科学版), 2012, 40(4):469-474.
[17]刘现鹏,张 强,展福兴. 高桩码头事故受损基桩修复技术研究[J]. 水道港口, 2006, 27:52-55.
[18]孙熙平,王元战,徐满意,等. 高桩码头基桩完整性检测技术研究综述[J]. 港工技术, 2010, 47(2):50-53.
[19]杨荣君,秦 武, 沈 斌,等. 高桩码头结构新型加固改造方案设计[J]. 水运工程, 2013,(10):122-127.
[20]李 建. 高桩码头桩基施工过程的质量控制与技术要点分析[J]. 中国水运, 2014, 14(5):305-306.