锦屏一级水电站大坝基础地质条件复杂,尤其以左岸f5断层为代表的软弱岩体,断层规模大、岩体性状差,是影响拱坝渗流稳定、抗滑稳定和变形稳定最为关键的因素之一,因而f5断层处理效果的好坏直接决定了锦屏一级水电站高拱坝能否长期安全运营。为此,对锦屏一级水电站高拱坝左岸坝基范围内的f5断层处理技术进行了探索和研究,介绍了开挖置换、预应力锚固、高压固结灌浆、水泥-化学复合灌浆及高压水对穿冲洗回填砼等处理措施,并对处理效果进行了分析和评价。监测成果表明,以上综合加固处理措施达到了预期的效果,可为类似工程提供参考和借鉴。
Abstract
The arch dam of Jinping first-stage hydropower station had complex geological conditions of dam foundation. Fault f5 in the left bank, a typical large-scale weak rock mass with poor rock properties, is a crucial factor affecting the dam’s seepage stability, anti-sliding stability and deformation stability. The reinforcement effect determines directly whether the dam could work safely in the long run. In the present paper we explored and introduced the technologies of reinforcing the fault, including excavation-displacement, prestressed anchorage, high pressure consolidation grouting, cement-chemical compound grouting and the technique of “two-ended high pressure washing then backfilling with concrete”. Also we analyzed and evaluated the reinforcement effect. Monitoring data suggest that these reinforcement measures have worked as expected, shortened construction period, saved cost, and compared with single measure, these comprehensive measures met the requirements of seepage stability, anti-sliding stability and deformation stability, and can be taken as references for similar engineering.
关键词
锦屏高拱坝 /
f5断层软弱带 /
坝基稳定性 /
加固 /
处理技术
Key words
Jinping high arch dam /
fault f5 /
stability of dam foundation /
reinforcement /
treatment technology
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 潘家铮,何 璟. 中国大坝50年[M].北京:中国水利水电出版社,2000. (PAN Jia-zheng, HE Jing. China’s Large Dams in the Past Half Century[M]. Beijing: China Water Power Press, 2000. (in Chinese))
[2] 汝乃华,姜忠胜. 大坝事故与安全\5拱坝[M]. 北京:中国水利水电出版社,1995. (RU Nai-hua, JIANG Zhong-sheng. Accidents & Safety: Arch Dam[M]. Beijing: China Water Power Press, 1995. (in Chinese))
[3] 林 鹏,王仁坤,康绳祖,等. 特高拱坝基础破坏、加固与稳定关键问题研究[J]. 岩石力学与工程学报,2011,30(10):1945-1958. (LIN Peng, WANG Ren-kun, KANG Sheng-zu,et al. Study on Key Problems of Foundation Failure, Reinforcement and Stability for Super High Arch Dams[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(10):1945-1958. (in Chinese))
[4] 魏 涛,邵晓姝,张 健. 水利行业化学灌浆技术最新研究及应用[J].raybet体育在线
院报,2014,31(2):77-81. (WEI Tao, SHAO Xiao-shu, ZHANG Jian. Latest Research and Application of Chemical Grouting Technology in Water Conservancy Industry[J]. Journal of Yangtze River Scientific Research Institute, 2014,31(2): 77-81. (in Chinese))
[5] 汪在芹,魏 涛,李 珍,等. CW 系环氧树脂化学灌浆材料的研究及应用[J].raybet体育在线
院报,2011,28(10):167-170. (WANG Zai-qin, WEI Tao, LI Zhen, et al. Study and Application of CW Epoxy Resin Chemical Grouting Materials[J]. Journal of Yangtze River Scientific Research Institute, 2011, 28(10): 167-170. (in Chinese))
[6] 裴向军,黄润秋,李正兵,等. 锦屏一级水电站左岸卸荷拉裂松弛岩体灌浆加固研究[J]. 岩石力学与工程学报,2011, 30(2):284-288. (PEI Xiang-jun, HUANG Run-qiu, LI Zheng-bing, et al. Research on Grouting Reinforcement of Unloading Fractured Loose Rock Mass in Left Bank of Jinping-I Hydropower Station[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(2): 284-288. (in Chinese))
[7] 邓争荣,吴树良,闵 文,等. 某水电站坝基碎裂岩工程性状及处理措施[J].raybet体育在线
院报,2013,30(6):58-62,67. (DENG Zheng-rong, WU Shu-liang, MIN Wen, et al. Engineering Characteristics and Treatment Measures of Cataclasite Rockmass at the Dam Foundation of Hydropower Station[J]. Journal of Yangtze River Scientific Research Institute, 2013,30(6): 58-62, 67. (in Chinese))
[8] 吴党中,刘国华. 拱坝基础处理中的传力洞设计[J].河海大学学报(自然科学版),2010,38(6):711-715. (WU Dang-zhong, LIU Guo-hua. Design of Concrete Plug in Foundation Treatment of Arc Dams[J]. Journal of Hohai University (Natural Science), 2010,38(6):711-715. (in Chinese))
[9] 龚伏秋,王满兴,闵 霁.白岩河水利工程坝基断层处理技术探讨[J].人民长江,2013,44(17):60-62. (GONG Fu-qiu, WANG Man-xing, MIN Ji. Discussion on Fault Treatment Technology in Dam Foundation of Baiyanhe Hydroproject[J]. Yangtze River, 2013,44(17): 60-62. (in Chinese))
[10]王 胜. 锦屏一级水电站左岸抗力体地质缺陷及加固处理技术研究[D]. 成都:成都理工大学,2010. (WANG Sheng. Analysis on Geological Defects and Reinforcement Technology on Left Bank Resisting Rock of Jinping I Hydropower Station[D]. Chengdu: Chengdu University of Technology, 2010. (in Chinese))
[11]国家电力公司成都勘测设计研究院.雅砻江锦屏一级水电站可行性研究报告(工程地质)[R] .成都:成都勘测设计研究院, 2003. (Power China Chengdu Engineering Corporation Limited. Report of Feasibility Study on Jinping-I Hydropower Station (Engineering Geology)[R]. Chengdu: Chengdu Engineering Corporation Limited, 2003. (in Chinese))
[12]郝才伟.锦屏一级左岸边坡与基础处理工程地质三维建模与分析研究[D].天津:天津大学,2008. (HAO Cai-wei. 3D Geological Modeling and Analysis on the Treatment Project for Left Bank Slope and Foundation of Jinping First-stage Hydropower Station[D]. Tianjin: Tianjin University, 2008. (in Chinese))