猴子岩面板堆石坝石料开采爆破试验与分析

杨晨光,钟权,冷振东,严鹏,卢文波

raybet体育在线 院报 ›› 2015, Vol. 32 ›› Issue (10) : 70-73.

PDF(3695 KB)
PDF(3695 KB)
raybet体育在线 院报 ›› 2015, Vol. 32 ›› Issue (10) : 70-73. DOI: 10.11988/ckyyb.20140301
岩土工程

猴子岩面板堆石坝石料开采爆破试验与分析

  • 杨晨光1,钟权1,冷振东2,严鹏2,卢文波2
作者信息 +

Blasting Test and Analysis of Stone Quarrying for Rock-fill Dam of Houziyan Hydropower Station

  • YANG Chen-guang1,ZHONG Quan1,LENG Zhen-dong2,YAN Peng2,LU Wen-bo2
Author information +
文章历史 +

摘要

面板堆石坝填筑料被要求具有良好的级配,以便使填筑的坝体既有较好的压实度,又有良好的排水性。针对大渡河猴子岩水电站堆石料开采,总结了在色龙沟料场进行的6次现场爆破试验,并根据不同钻爆设计及爆破料筛分成果,分析了影响堆石料爆破颗粒级配的主要因素。成果分析表明,炮孔间排距、堵塞长度以及炸药单耗量等参数都会影响爆破料级配,在进行大规模料场开采前,应针对不同影响因素进行爆破试验,确定最为合理的爆破参数。猴子岩面板堆石坝色龙沟料场现场爆破试验取得了符合堆石料设计要求的爆破施工方案及钻爆参数,可为类似工程提供借鉴和参考。

Abstract

Good gradation is required for the filling material of concrete face rock-fill dam in order to ensure good compaction and drainage. Taking the rock-fill material quarrying at Houziyan hydropower station on Dadu river as a research background, we summarize 6 groups of field blasting test in Selonggou quarry, and analyze the main factors affecting the rock-fill material gradation based on different blasting designs and screening results. Research results show that the gradation is affected by spacing between blasting holes, length of stem blocking, and unit consumption of detonator. Before large-scale stone quarrying, blasting tests should be conducted for each impact factor in order to determine the optimal blasting parameters. Through the field blasting tests, blasting scheme and parameters that can be used to get eligible rock-fill material are obtained, and the achievements in this research can be guidance and reference for similar projects.

关键词

猴子岩水电站 / 面板堆石坝 / 爆破试验 / 钻爆参数 / 级配

Key words

Houziyan hydropower station / rock-fill dam / blasting test / drilling and blasting parameters / gradation

引用本文

导出引用
杨晨光,钟权,冷振东,严鹏,卢文波. 猴子岩面板堆石坝石料开采爆破试验与分析[J]. raybet体育在线 院报. 2015, 32(10): 70-73 https://doi.org/10.11988/ckyyb.20140301
YANG Chen-guang ,ZHONG Quan ,LENG Zhen-dong ,YAN Peng ,LU Wen-bo. Blasting Test and Analysis of Stone Quarrying for Rock-fill Dam of Houziyan Hydropower Station[J]. Journal of Changjiang River Scientific Research Institute. 2015, 32(10): 70-73 https://doi.org/10.11988/ckyyb.20140301
中图分类号: D235.3   

参考文献

[1] 张正宇,张文煊,吴新霞,等. 现代水利水电工程爆破[M]. 北京:中国水利水电出版社,2003. (ZHANG Zheng-yu, ZHANG Wen-xuan, WU Xin-xia, et al. Modern Water Conservancy and Hydropower Engineering Blasting[M]. Beijing: China Water Power Press, 2003. (in Chinese))
[2] 于 涛,李高正. 观音岩水电站堆石坝石料开采爆破试验与分析[J]. 爆破, 2011, 28(4): 47-49. (YU Tao, LI Gao-zheng. Blasting Trial and Analysis of Stone Quarrying for Rock-fill Dam in Guanyinyan Hydropower Station[J]. Blasting, 2011, 28(4): 47-49. (in Chinese))
[3] 黄永成,刘俊杰. 巴贡水电站堆石坝填筑料生产爆破试验研究[J]. 四川水力发电,2008, 27(6):12-14. (HUANG Yong-cheng, LIU Jun-jie. Study on Blasting Test on Fill Material of Roek-fill Dam at Bakun Hydropower Station before Construction[J]. Sichuan Water Power, 2008, 27(6): 12-14.(in Chinese))
[4] 汪 辉,张延林,王小和. 微差挤压爆破在堆石坝过渡料开采中的应用[J]. 爆破,2011,28(3): 43-45. (WANG Hui, ZHANG Yan-lin, WANG Xiao-he. Application of Millisecond Compression Blasting for Transition Material Mining for Rock Fill Dam[J]. Blasting, 2011, 28(3): 43-45.(in Chinese))
[5] 姜凤海,徐文林,牛运华,等. 水布垭混凝土面板堆石坝填筑料开采爆破试验[J]. raybet体育在线 院报,2003,20(增刊):48-52. (JIANG Feng-hai, XU Wen-lin, NIU Yun-hua, et al. Trial Production Blasts of the Rock Filling Materials for Shuibuya Concrete Face Rockfill Dam[J]. Journal of Yangtze River Scientific Research Institute,2003,20(Sup.): 48-52.(in Chinese))
[6] 赵 伟, 王近宏. 浅谈大渡河长河坝水电站大坝堆石料爆破开采技术[J]. 四川水力发电,2012,31(4):86-89. (ZHAO Wei, WANG Jin-hong. Brief Discussion on Technologies of Blasting Mining of Rock-fill Material at Changheba Hydropower Station[J]. Sichuan Water Power, 2012, 31(4): 86-89.(in Chinese))

基金

国家自然科学基金项目(51279146);国家973课题(2011CB013501)

PDF(3695 KB)

Accesses

Citation

Detail

段落导航
相关文章

/

Baidu
map