石门坎大坝栈桥桥墩爆破倾倒历时及振动效应分析

占学军, 任贤斌, 张晓平

raybet体育在线 院报 ›› 2012, Vol. 29 ›› Issue (7) : 41-44.

PDF(1340 KB)
PDF(1340 KB)
raybet体育在线 院报 ›› 2012, Vol. 29 ›› Issue (7) : 41-44. DOI: 10.3969/j.issn.1001-5485.2012.07.009
工程安全与灾害防治

石门坎大坝栈桥桥墩爆破倾倒历时及振动效应分析

  • 占学军,任贤斌, 张晓平
作者信息 +

Toppling Duration and Vibration Effect Caused by Blasting of Hydraulic Trestle Pier

  • ZHAN Xue-jun,REN Xian-bin, ZHANG Xiao-ping
Author information +
文章历史 +

摘要

水工栈桥桥墩拆除爆破若处理不当,会对临近的水工建筑物造成永久性影响。通过对石门坎水电站栈桥的爆破倾倒历时及振动效应分析,给出了栈桥倾倒历时的求解公式,并指出了减少振动影响的相关措施。结果表明栈桥倾倒历时的实测数据与理论计算基本相符,爆破未对周边建筑物产生有害影响。

Abstract

Improper handling of the demolition blasting of hydraulic trestle pier will cause permanent effect on the hydraulic structure. Based on monitoring data and macroscopic survey, the authors analyzed the toppling duration and vibration effect of the trestle of Shimenkan hydropower station, and gave the calculation formula of toppling duration which is an improvement compared with former methods. Measures of reducing vibration effect were proposed. No adverse impact was exerted on surrounding buildings by the blasting, and the monitored toppling duration data generally agreed  with theoretical calculation result.

关键词

爆破 / 栈桥 / 历时 /  振动 / 倾倒

Key words

blasting / trestle / duration / vibration / toppling 

引用本文

导出引用
占学军, 任贤斌, 张晓平. 石门坎大坝栈桥桥墩爆破倾倒历时及振动效应分析[J]. raybet体育在线 院报. 2012, 29(7): 41-44 https://doi.org/10.3969/j.issn.1001-5485.2012.07.009
ZHAN Xue-Jun, REN Xian-Bin, ZHANG Xiao-Ping. Toppling Duration and Vibration Effect Caused by Blasting of Hydraulic Trestle Pier[J]. Journal of Changjiang River Scientific Research Institute. 2012, 29(7): 41-44 https://doi.org/10.3969/j.issn.1001-5485.2012.07.009
中图分类号: TD235   