橡胶坝塌坝产生的最大泄流量是汛期橡胶坝控制运用的关键,为了快速准确地计算橡胶坝塌坝产生的最大泄流量,依据橡胶坝坝高、河道比降、蓄水量、坝长及塌坝时间等因素组合了102个塌坝方案,模拟计算了塌坝产生的最大泄流量。分析表明,橡胶坝塌坝产生的最大泄流量与坝长、蓄水量、河道坡度、坝高、塌坝时间等因素有关。在此基础上,利用统计分析方法建立了橡胶坝塌坝产生的最大泄流量估算经验公式,该公式包括了蓄水量、塌坝时间、坝长、坝高、侧收缩系数等因素。经验证该公式具有快速、准确的特点,方便实用。
Abstract
The maximum discharge generated by the collapse of rubber dam is crucial for the control and running of rubber dam in flood season. To calculate the maximum discharge caused by rubber dam collapse quickly and accurately, 102 scenarios of rubber dam collapse were designed to simulate the maximum discharge caused by dam collapse. Dam height, river slope, water storage, length of dam, and dam collapse duration and other factors were selected as variables in the scenarios. The empirical formula for estimating the maximum discharge generated by the collapse of rubber dam involving dam length, dam height, water storage, complete dam collapse duration, and lateral contraction coefficient was presented using statistical analysis method. Example verification demonstrate that the empirical formula is quick in calculating and accurate in result, and also practical and convenient.
关键词
塌坝泄流 /
最大泄流量 /
塌坝方案 /
快速估算 /
大坝控制运用 /
橡胶坝
Key words
discharge of dam collapse /
maximum discharge /
dam collapse scheme /
fast estimation /
controlled operation of dam /
rubber dam
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] KAHL T, RUELL S. Flashboard Alternatives Including Rubber Dams[C]∥Proceedings of Waterpower '89, Niagara Falls, New York. August 23-25,1989: 447-456.
[2] CONRAD D A, MULDOON D P. Design and Application of a PC/PLC Utility Rubber Dam Control System[J]. Instrument Society of America,1995(6): 351-362.
[3] PLAUT R H, LIAPIS S I, TELIONIS D P. When the Levee Inflates[J]. Civil Engineering, 1998(1): 62-64.
[4] 田忠禄.具有决策支持系统的枢纽橡胶坝安全运行管理自动化系统研究[J].中国水利水电科学研究院学报,2008, 6(1):56-59.
[5] ZHANG X Q, TAM P W M, ZHENG W. Construction, Operation, and Maintenance of Rubber Dams[J]. Canadian Journal of Civil Engineering, 2002, 29(3): 409-420.
[6] TAM P W M, ZHANG X Q. Management of Rubber Dams in Hong Kong[J]. Canadian Journal of Civil Engineering, 1999, 26(2): 123-134.
[7] 徐智廷,孙廷玺,张世功,等. 沂河梯级橡胶坝汛期调度运用原则探讨[J].中国水利,2008(19):61-62.
[8] 李风增. 胶南市风河梯级橡胶坝综合管理与运用[J].中国水利, 2007(16): 65.
[9] 吴军华,孟红军.安阳市洹河梯级橡胶坝联合运行探讨[J].河南水利与南水北调,2010(4):36-37.
[10]张世功,孙廷玺,段伟华,等. 沂河梯级橡胶坝调度运用实况对洪水影响分析[J]. 治淮,2010(5):15-17.
[11]温会军.辽河干流橡胶坝联合调度方案编制方法[J].现代农业科技,2012(9):274-276.
[12]赵 伟.基于串并联关系的橡胶坝群调度研究 [J]. 河北水利,2016(1):43-47.
[13]陈 瑞. 对橡胶坝流量系数的探索[J]. 水利学报,1987(6):36-39.
[14]苑希民,林继镰. 溢流橡胶坝泄流特性试验[J].天津大学学报,1996,29(3):342-348.
[15]ZHANG Q H, DIAO Y F. Cascade Rubber Dams Fall Discharge Calculation and Analysis[J]. Canadian Journal of Civil Engineering, 2011, 38(8): 957-962.
[16]张庆华,刁艳芳,程传民,等.梯级橡胶坝塌坝泄流计算仿真系统[J]. 水利水电科技进展,2014,34(4):53-56.
[17]刘 丹, 孙西欢, 李永业.溢洪道安设橡胶坝对其水力特性影响的试验研究[J]. raybet体育在线
院报,2015,32(10):43-46.
[18]刘 杨 ,张瑞海, 刘 娟.基于MIKE FLOOD模型的西北城市河道橡胶坝群洪水风险分析研究 [J].水利与建筑工程学报,2016,14(6):113-119.
[19]杨菊香.汾河太原段梯级橡胶坝调度运用方式研究[J]. 山西水利,2016,32(10):26-27.
[20]周 敏, 田 淳.充水式橡胶坝坝高与坝袋充水量、堰顶水头的关系[J]. 水电能源科学,2017(8):76-78.
基金
raybet体育在线
开放研究基金资助项目(CKWV2018460/KY);山东省重大水利科研与技术推广项目 (SDSLKY201233)